请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Yao Mu Realty Sdn Bhd
Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
营业
时间
星期一 - 星期日 9:00 AM - 10:00 PM
营业 休息
SSM

ECRL Hits 88% Milestone as Selangor’s C1B Segment Reaches Completion

06-Nov-2025

KUALA LUMPUR, Nov 4 — The East Coast Rail Link (ECRL) project has officially surpassed the 88% completion mark with the successful delivery of the C1B Segment, a key milestone that finalizes the first phase of civil works connecting Kelantan to the Gombak Integrated Terminal.

Construction of the C1B Segment began in September 2022, covering the technically demanding section from the Genting Tunnel exit to the Gombak Integrated Terminal Station. The segment includes the Gombak Tunnel itself, two major bridges, and critical subgrade works — forming a vital link between Malaysia’s East Coast and the Klang Valley.

Malaysia Rail Link Sdn Bhd (MRL) chief executive officer Datuk Seri Darwis Abdul Razak said that the completion of this segment represents not just a construction milestone, but also progress toward national connectivity and economic transformation.

“This achievement brings Selangor’s overall ECRL progress to around 77%. It’s more than just a section of railway — it’s a national vision to connect communities, drive logistics efficiency, and open new corridors of growth,” he said during the completion ceremony on Tuesday.

Darwis added that MRL views the ECRL as a catalyst for sustainable progress, incorporating environmental, social, and governance (ESG) principles to ensure low-carbon mobility and green construction practices.

“By linking rural regions to major urban hubs like Kuala Lumpur, Bukit Jalil, and Puchong, the ECRL will unlock new investment zones, support inclusive participation, and strengthen national unity in line with Malaysia Madani’s vision,” he said.

Meanwhile, China Communications Construction (ECRL) Sdn Bhd (CCCECRL) managing director Deng Bo highlighted the engineering challenges of the Selangor section — particularly the C1B stretch, which passes through dense urban zones with limited construction space and complex geology.

“Building near major highways and transport hubs required meticulous coordination and strong collaboration with local authorities. By implementing modular prefabrication, digital precision measurements, and advanced simulation analyses, we maintained high safety and quality standards throughout,” Deng explained.

With the C1B Segment now completed, the project is poised to move into the next critical phases — including track installation, system integration, and testing in Selangor. These works are expected to pave the way for full connectivity by the end of 2026.

This milestone not only reinforces Malaysia’s infrastructure advancement but also signals new opportunities for industrial land in Selangor, office space in Bukit Jalil, factories in Puchong, and commercial properties across the KL and Subang areas — as improved rail access enhances mobility, logistics, and business growth across the state.

总办事处

Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
Unit 15-3,The Link 2, Jalan Jalil Perkasa 3, 57000 Bukit Jalil, Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.yaomurealty.com
网址: https://yaomurealty.newpages.com.my/
网址: https://yaomurealty.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • BR 10798
  • VN 5331
  • CN 1962
  • AR 1590
  • US 1521
  • MY 859
  • EC 664
  • SG 446
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us