请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Yao Mu Realty Sdn Bhd
Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
营业
时间
星期一 - 星期日 9:00 AM - 10:00 PM
营业 休息
SSM
商业性质:

代理 服务业

MAHB: KLIA Aerotrain Issues Related to ‘Standard Failures’, Daily Offline Window Introduced for Long-Term Reliability - Yao Mu Realty Sdn Bhd

MAHB: KLIA Aerotrain Issues Related to ‘Standard Failures’, Daily Offline Window Introduced for Long-Term Reliability

17-Nov-2025

SEPANG (Nov 14): Malaysia Airports Holdings Bhd (MAHB) clarified that the recent Kuala Lumpur International Airport (KLIA) aerotrain disruptions were caused by “standard failures” encountered during live operations, and confirmed that all identified issues have now been rectified. Beginning Nov 15, 2025, the aerotrain will undergo a scheduled daily shutdown of 10 hours to ensure long-term system stability and prevent future breakdowns.

Chief airports officer Bryan John Thompson said during a Friday media briefing that the four disruptions—recorded since the aerotrain resumed operations on July 1—were unrelated incidents that surfaced only under real-world conditions.

“These were standard failures that emerged during operation. Each issue was different, and each has been addressed. Our comprehensive action plan is designed to ensure these problems do not recur,” Thompson said.

Despite the setbacks, the aerotrain has maintained an operational service availability of above 98%, except in October, when performance dipped to 95.89%.


Three-Stage Action Plan Begins Nov 15

MAHB has initiated a structured corrective roadmap:

Stage 1 (Nov 15): Inspection, testing, system alignment and verification
Stage 2 (Dec 1): System-wide and vehicle-level testing
Stage 3 (Dec 15): Trial operations under live airport conditions

A revised completion date has not been finalised, though MAHB maintains that the plan is necessary to meet global benchmarks for reliability.

IJM Corp Bhd and Pestech International Bhd—responsible for the aerotrain’s power system—were involved in the latest incidents on Oct 15 and 28, while Alstom SA, the French rolling stock supplier, remains the project’s original equipment manufacturer.


Real-World Operations Exposed Issues Not Seen During Testing

MAHB managing director Datuk Mohd Izani Ghani stressed that testing phases cannot fully replicate live airport environments.

“In controlled testing, everything works differently. Real operations reveal what needs to be corrected. The important thing now is ensuring full reliability moving into the new year,” he said.

Both MAHB and Pestech declined to revisit past controversies involving project delays, saying the focus is now on executing the action plan.

Pestech and Alstom won the initial contract in 2021, but MAHB terminated Pestech’s role in 2023 due to non-performance. A revised arrangement in January 2024 placed Alstom and the IJM-Pestech JV jointly in charge of delivering the project—each responsible for separate scopes.

The aerotrain system, originally targeted for completion in early 2025, was later pushed to July.


Maintaining High Standards for Passenger Experience

Thompson emphasised that MAHB holds itself to world-class standards, noting that global rail systems aim for above 99% availability.

“Above 99% is excellent and considered world-class. We aim to deliver that level of service for the travelling public,” he said.

The KLIA aerotrain is a key connectivity component supporting the broader airport ecosystem—which has spillover effects on surrounding asset classes such as commercial property in KL, logistics hubs tied to industrial land in Selangor, business districts near office space in Bukit Jalil, and airport-linked industrial parks supporting factory demand in Puchong and the industrial property market in the Subang area.

总办事处

Yao Mu Realty Sdn Bhd 202301018134 (1512056-A)
Unit 15-3,The Link 2, Jalan Jalil Perkasa 3, 57000 Bukit Jalil, Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.yaomurealty.com
网址: https://yaomurealty.newpages.com.my/
网址: https://yaomurealty.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • BR 22138
  • VN 13037
  • US 5904
  • IN 4418
  • AR 3682
  • ID 2549
  • IQ 2026
  • PK 1984
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us