请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Green Energy Automation Sdn Bhd
Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
营业 休息
Onesync AI SSM
60187891859
mychinkee WeChat QR
WeChat QR

Wechat ID: mychinkee

Concrete Curing

19-Aug-2025

Concrete curing is the process of maintaining proper moisture and temperature in freshly placed concrete to ensure optimal hydration and strength development. It's crucial for achieving desired durability and preventing issues like cracking. While concrete is generally considered dry enough to walk on after 24-48 hours, full curing to maximum strength takes about 28 days. 
Why is curing important?

  • Hydration:
    Curing allows the cement in concrete to properly hydrate, which is the chemical reaction between cement and water that hardens the concrete. 
  • Strength Development:
    Proper curing ensures the concrete achieves its intended strength and durability. 
  • Durability:
    Curing helps prevent cracking, reduces permeability, and improves wear resistance. 
  • Reduced Shrinkage:
    Curing delays drying shrinkage, which can cause cracking as the concrete hardens. 

How to cure concrete:
  • Maintaining Moisture:
    Keep the concrete surface wet or damp using methods like ponding, spraying, or covering with wet burlap or mats. 
  • Controlling Temperature:
    In some cases, insulation or other methods may be needed to maintain a suitable temperature for hydration, especially in cold or hot weather. 

Curing methods:
  • Wet Curing: This involves keeping the concrete surface continuously wet, often using water, wet coverings, or ponding. 
  • Membrane Curing: Applying a curing compound that forms a film to prevent moisture loss. 
  • Steam Curing: Using steam to accelerate the curing process, often in precast concrete production. 
  • Electrical Curing: Applying heat through electrical means to accelerate curing. 
  • Formwork Curing: Leaving the forms in place to retain moisture. 

Curing Time:
  • Initial Stage (24-48 hours): Forms can be removed, and light foot traffic is generally acceptable. 
  • Critical Period (7-10 days): Concrete reaches a significant portion of its strength. 
  • Full Curing (28 days): Concrete attains maximum strength and durability. 
总办事处

Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
No. 2, Jalan Selatan 3/2, Taman Perindustrian Ringan Pulai, 81300 Skudai, Johor, Malaysia.

电话:

邮件:
网址: https://www.geasb.com
网址: https://geasb.newpages.com.my/
网址: https://geasb.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us