请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
ARCHIXDRAFT SDN BHD
ARCHIXDRAFT SDN BHD 200801013295 (814583-P)

New DBKL rule sets time limit on home renovations

24-Jun-2024

KUALA LUMPUR: House owners here who wish to renovate their homes have to complete the work within a year of the date the renovation plan is approved, says Kuala Lumpur City Hall (DBKL).

Its Building Control Department director Norizan Sulaiman said beginning early this year, all house renovation plans approved by the council would be valid for a year.

The ruling, she said, was given the go-ahead by the One-Stop Centre (OSC) committee headed by mayor Datuk Seri Mahadi Che Ngah.

“If house owners fail to complete renovations within a year of the date of approval, they will have to apply to renew the plan.

“But they must give a very good reason to convince the OSC,” she said, adding that the plan could only be renewed up to three times.

The fee for processing the approval would be RM100 per application, Norizan said.

Previously, there was no validating period for house renovation plans. The ruling came about because some homeowners took years to complete renovations.

Norizan said the number of complaints on the nuisance brought about by never-ending renovations had been increasing.

“It did not seem fair for people to have to put up with the endless hacking and the dangers of dust pollution,” she added.

The Uniform Building By-Law 1984 does not provide a time frame for renovations to be completed.

In the past, those affected by their neighbour’s renovation that became a safety issue could take action under the Local Government Act.

Those affected could lodge a complaint with DBKL and the local authority could compel the house owner to fix the repairs caused by his or her construction.

Alternatively, affected residents could also take a civil suit or even sue the local authority to compel them to take action.

总办事处

ARCHIXDRAFT SDN BHD 200801013295 (814583-P)
NO.4, 2ND FLOOR, JALAN KENARI 1, BATU 8 BANDAR PUCHONG JAYA, 47170 PUCHONG, SELANGOR, MALAYSIA.

电话:

邮件:
网址: https://www.buildingpermit.com.my
网址: https://buildingpermit.newpages.com.my/
网址: https://buildingpermit.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • VN 2462
  • US 1238
  • BR 1038
  • CN 882
  • SG 452
  • GB 324
  • HK 275
  • MX 244
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us