请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
MYLANDFACTORY
MYLANDFACTORY 202001043757 (1400079-A)
Onesync Platinum SSM
商业性质:

代理 服务业

相关分类:

产业

Johor Goes Solar: Mega Projects Powering Malaysia’s Green Future - MYLANDFACTORY

Johor Goes Solar: Mega Projects Powering Malaysia’s Green Future

08-Jul-2025

Johor’s Bold Move into Solar Energy: Powering Malaysia’s Green Future

Johor is rapidly emerging as a leader in Malaysia’s renewable energy landscape, spearheaded by major solar projects and strategic investments aligned with the National Energy Transition Roadmap (NETR). The state's commitment to sustainability is attracting significant private and foreign investments, positioning Johor as a key hub in Southeast Asia's clean energy future.

Flagship Projects

1. Sultan Ibrahim Solar PV Park – Pengerang

  • Highlights: Envisioned to host Southeast Asia’s largest solar energy storage system.

  • Impact: Catalyzing Johor’s green economy through job creation, infrastructure development, and increased energy security.

  • Backed by: Malaysian Institute of Economic Research and MIDA (Malaysian Investment Development Authority).

2. Renewable Energy Industrial Park – Iskandar Puteri

  • Size: 40 acres

  • Partners: UEM Sunrise, Itramas Corporation, and China Machinery Engineering Corporation.

  • Features: Solar module manufacturing, R&D facilities, and renewable energy infrastructure development.

Why Johor is Ideal for Solar Energy

  • Strategic Location: Close proximity to Singapore for future energy export opportunities.

  • High Solar Irradiance: Favorable climate conditions ensure optimal solar performance.

  • Land Availability: Ample land for utility-scale solar farms and industrial expansion.

  • Strong Demand: Growing corporate appetite for clean energy via Virtual Power Purchase Agreements (VPPAs) and green energy contracts.

What’s Driving the Momentum?

  • National Energy Transition Roadmap (NETR): A comprehensive framework guiding Malaysia’s shift to sustainable energy.

  • Government Commitment: Johor’s state government is fast-tracking approvals and supporting infrastructure.

  • Private Sector Investment: Projects like the Sultan Ibrahim Solar PV Park mark the state’s first large-scale private renewable energy investment.

  • Employment Opportunities: Renewable energy is generating skilled and semi-skilled jobs across sectors.

  • Green Lifestyle Incentives: Rooftop solar, EV charging, and clean energy plans are increasingly available to businesses and residents.

Looking Ahead (2024–2027)

Major solar and renewable infrastructure projects are expected to come online, transforming Johor’s energy grid and industrial potential. The state aims to build a robust renewable energy supply chain, reduce carbon emissions, and become a regional exporter of green energy.

总办事处

MYLANDFACTORY 202001043757 (1400079-A)
Johor, Malaysia.

电话:

邮件:
网址: https://www.mylandfactory.com
网址: https://mylandfactory.newpages.com.my/
网址: https://mylandfactory.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • US 6085
  • BR 4451
  • VN 3916
  • AU 1319
  • TH 1240
  • JP 1177
  • SG 843
  • CA 661
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us