请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
TRINITY INDUSTRIAL SOLUTION SDN BHD
TRINITY INDUSTRIAL SOLUTION SDN BHD 201401018041 (1094128-A)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 - 星期日 休息
我们在 公共假期休息
营业 休息

Install Parshall Flume, Civil Work

Install Parshall Flume, Civil Work

Installing a Parshall flume involves several steps, including site preparation, flume positioning, and securing it in place. The process requires precision to ensure accurate flow measurement. Here’s a step-by-step guide:
 

1. Site Preparation

  • Survey the Area: Identify the best location for the flume. Choose a straight section of the channel with a consistent flow and minimal turbulence.
  • Excavate the Site: Prepare a trench or area where the flume will be installed. The trench should accommodate the flume’s size and shape, leaving room for anchoring and adjustments.
  • Level the Base: Ensure the base is level and stable. A level base is crucial for accurate flow measurement. Use concrete or compacted soil as needed.
 

2. Prepare the Flume

  • Inspect the Flume: Check for damage or irregularities that might affect its installation or operation.
  • Seal the Joints: If the flume is made of multiple sections, assemble and seal the joints with waterproof materials like silicone or epoxy.
 

3. Position the Flume

  • Align with the Flow: Place the flume in the channel, ensuring it is centered and aligned with the direction of flow.
  • Set the Invert Elevation: Ensure the flume’s throat (the narrowest part) is at the correct elevation relative to the flow line. Use a level or laser leveling tool for accuracy.
  • Check for Levelness: Ensure the flume is level from side to side and properly sloped in the direction of flow as specified by the manufacturer.
 

5. Install Accessories

  • Flow Measurement Devices: Attach any required flow meters, staff gauges, or ultrasonic sensors according to manufacturer guidelines.
  • Connect Upstream and Downstream Channels: Ensure smooth transitions at the inlet and outlet to minimize turbulence and ensure accurate measurements.
 

6. Test the Installation

  • Inspect for Leaks: Run water through the flume to check for leaks or misalignments.
  • Verify Measurements: Compare flow readings with expected values to confirm accuracy.
  • Adjust if Necessary: Make any necessary adjustments to the alignment, level, or sealing.
 

7. Maintenance and Calibration

  • Regularly inspect the flume for sediment buildup, blockages, or wear.
  • Calibrate measurement devices periodically to ensure continued accuracy.



 
总办事处

TRINITY INDUSTRIAL SOLUTION SDN BHD 201401018041 (1094128-A)
IOI Boulevard, Lot F-2-16, Jalan Kenari 5, Bandar Puchong Jaya, 47170 Puchong, Selangor, Malaysia.

电话:

邮件:
网址: https://www.trinityissb.com
网址: https://trinityissb.newpages.com.my/
网址: https://trinityissb.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us