请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

14-May-2026

Industrial AHU Casing & Panel Restoration: AC Lining Replacement

In the 2026 Malaysian mechanical sector, AC Lining Replacement is a high-impact restoration task focused on eliminating the risks associated with aged, degraded, or moisture-saturated insulation. Under the Energy Efficiency and Conservation Act (EECA) 2024 and the DOSH (JKKP) 2026 Hygiene Codes, any internal insulation that is shedding fibers, harboring mold, or losing its thermal $R$-value is considered a statutory liability.

At EKG (Malaysia) SDN BHD, we replace legacy internal linings with advanced, fiber-free, and antimicrobial materials that satisfy the stringent MS 1525:2024 standards for high-performance buildings.


1. The Statutory Mandate: EECA 2024 & IAQ

Replacing an AC lining is a mandatory step for facilities aiming to maintain their energy and health certifications in 2026.

  • Thermal Efficiency (BEI Improvement): Saturated fiberglass insulation loses its ability to resist heat transfer. By replacing it with high-density, closed-cell materials, we restore the Thermal Break (TB2), directly lowering your Building Energy Intensity (BEI).

  • Sterile Air Path (DOSH 2026): Old linings often act as a "biological reservoir" for pathogens. Replacement ensures the air path is non-porous and "Self-Sanitizing," a core requirement for passing 2026 Indoor Air Quality (IAQ) audits.

  • Acoustic Compliance: Under MS 1525:2024, sound attenuation must be achieved without the use of materials that shed particulates. Our replacement linings provide superior noise reduction (NC 30-35) while remaining 100% fiber-free.


2. Core AC Lining Replacement Modules

We treat the internal casing as a cleanroom-grade environment, utilizing materials that do not degrade in the high-humidity (90%+) Malaysian climate.

Replacement Stage Technical Action Purpose
Legacy Removal Controlled extraction of old fiberglass or mineral wool. Eliminates the source of fiber-shedding and bio-contamination.
Substrate Sterilization Deep chemical neutralization of the inner panel surface. Ensures the new lining is applied to a sterile, rust-free base.
Closed-Cell Installation Applying high-density Elastomeric or PE foam linings. Provides a 100% moisture-proof and non-porous thermal barrier.
Vapor-Proof Seaming Sealing all joints with antimicrobial, reinforced foil or mastic. Prevents moisture from reaching the core and breeding mold.

3. Engineering for "Zero-Shedding & Thermal Health"

The EKG approach targets the mechanical and biological failure points of traditional insulation.

  1. Fiber-Free Guarantee: We utilize materials like Nitrile Rubber (NBR) or Cross-linked Polyethylene (XLPE). These are inherently non-fibrous, ensuring that your IE5 EC Fan Wall isn't distributing microscopic glass shards into the office environment.

  2. Hydrophobic Integrity: Unlike fiberglass, which acts like a sponge, our replacement linings are hydrophobic. This prevents "Base Rot" and ensures that even if condensation occurs, it drains into the Statutory 1:100 Slope pan rather than soaking into the panels.

  3. Laminar Flow smoothing: New linings are installed flush and precisely cut to minimize air turbulence. This lowers the internal static resistance, helping your unit stay within the statutory 1.6 kW/m³/s SFP limit.


4. The "Fire Mode" Statutory Protocol

Replacement materials must satisfy the life-safety requirements of BOMBA (JBPM) 2026.

  • Class 0 Fire Rating: All replacement linings used by EKG are certified Class 0 (BS 476 Part 6 & 7). This ensures they do not contribute to flame spread or release toxic black smoke during a fire.

  • High-Velocity Adhesion: We utilize industrial-grade, heat-resistant adhesives to ensure the lining does not "peel away" during the high-pressure surges of an Automatic Fire Signal AHU Shut-off.

  • BOMBA Audit: JBPM officers verify the fire-retardant markings of the new internal linings during the annual Fire Certificate (FC) audit.


5. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: We are mechanical and T&C specialists, not just general insulators. We ensure the new lining optimizes the thermodynamic performance of the AHU.

  • Audit-Ready Reporting: Following replacement, we provide a Thermal & Acoustic Integrity Report, essential for your Registered Energy Manager (REM).

  • GITA Sustainability: Replacing inefficient insulation is a recognized "Energy Retrofit" strategy. We provide the data required for your 100% Green Investment Tax Allowance (GITA) claims.

Is your internal AC lining sagging, shedding, or failing your IAQ audit?

Contact EKG (Malaysia) SDN BHD today for a professional AC Lining Replacement Audit & Statutory Compliance Restoration.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us