请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

13-May-2026

Industrial AHU Casing & Panel Restoration: Fixing Rusted AHUs

In the 2026 Malaysian industrial sector, a rusted AHU is more than a maintenance eyesore; it is a statutory violation under the Energy Efficiency and Conservation Act (EECA) 2024 and DOSH (JKKP) 2026 hygiene codes. Rust leads to "Exfoliation Corrosion," which breaches the casing's hermetic seal, causes air leakage, and destroys the Thermal Break. This "Energy Bleeding" directly inflates your Building Energy Intensity (BEI) and can result in the rejection of your building’s energy certification.

At EKG (Malaysia) SDN BHD, our restoration protocols focus on neutralizing oxidation and rebuilding the structural integrity of the unit to ensure it is Statutory-Compliant, Sterile, and Optimized.


1. The Statutory Risk of Corrosion

Under the current 2026 regulatory framework, ignoring rust on your AHU can lead to:

  • EECA 2024 Non-Compliance: Rusted seams allow conditioned air to escape (ATC 6 violation), forcing your VFD-driven AHU to ramp up speed and exceed the statutory 1.6 kW/m³/s SFP limit.

  • DOSH IAQ Violations: Rust particles and associated moisture promote mold colonization. DOSH officers categorize a rusted internal casing as a "Source of Bio-Contamination."

  • BOMBA Structural Risk: Severe "Base Rot" compromises the unit's ability to withstand the static pressure surge during an Automatic Fire Signal AHU Shut-off.


2. The EKG "Fixing" Protocol: Step-by-Step

Phase Technical Action Purpose
I: Mechanical De-scaling Grinding to SSPC-SP3/SP11 standards using needle scalers or wire wheels. Removes loose rust "scales" to reach the sound base metal.
II: Chemical Neutralization Application of phosphoric-based rust converters or chelating agents. Converts residual iron oxide into a stable, inert black ferro-organic complex.
III: Zinc-Rich Priming Application of Cold Galvanizing or Polyamide Epoxy Zinc primers. Provides "Sacrificial Protection" to prevent future oxidation.
IV: Structural Patching Welding or bonding of heavy-gauge GI patches with fire-rated sealants. Restores the pressure boundary and structural integrity of the AHU Box.
V: C5-M Top Coating High-build Aliphatic Polyurethane (UV-stable). Provides a final, chemical-resistant barrier against KL's 90%+ humidity.

3. Engineering Focus: Base Frame & Support Channels

The most critical area when "fixing" a rusted AHU is the interface between the unit and the Vibration Isolators.

  1. Base Rot Repair: We perform structural reinforcement of the C-channels. If the base is compromised, the AHU will lose its precision level, causing condensate to pool rather than drain, leading to Legionella risks.

  2. Thermal Bridge Decoupling: During the rust repair, we ensure that new patches do not create a "Cold Bridge." We reinstall thermal isolation gaskets at the panel interfaces to prevent exterior "sweating."

  3. Fastener Audit: We replace all rusted standard fasteners with Marine Grade 316 Stainless Steel bolts and neoprene-bonded washers to ensure an airtight, corrosion-proof seal.


4. Life-Safety & Fire Code Compliance

Every rust restoration project at EKG is designed to satisfy BOMBA (JBPM) 2026 requirements.

  • Class 0 Certification: All restoration materials—from the primers to the patching sealants—are certified Class 0 (BS 476) for flame spread.

  • Structural Stability: We verify that the restored AHU Body can handle the "Torque Spike" of the fans during emergency smoke management cycles without structural failure.

  • BOMBA Audit Readiness: We provide the documentation required for your annual Fire Certificate (FC) audit, proving the unit is structurally sound and fire-safe.


5. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: We are mechanical and T&C specialists, not just general painters. We fix the performance and structure of the AHU.

  • GITA Sustainability: Restoring a rusted AHU is a "Life-Extension" strategy. Under the 100% Green Investment Tax Allowance (GITA), this work can often be claimed as a green capital expenditure.

  • Audit-Ready Reporting: We provide a Structural Integrity & Coating Performance Report, including DFT (Dry Film Thickness) measurements for your Registered Energy Manager (REM).

Is your AHU "rotting" away your energy budget and failing statutory audits?

Contact EKG (Malaysia) SDN BHD today for a professional Rusted AHU Structural Audit & Restoration Proposal.

Are you seeing rust primarily on the exterior rooftop panels, or has it started to compromise the internal floor and fan sections?

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us