请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

12-May-2026

Mechanical Unit Rigging: 2026 Engineering & Statutory Standard

In the 2026 engineering landscape of Malaysia, Mechanical Unit Rigging (specifically for AHUs, chillers, and large HVAC assets) is a high-precision operation governed by the Energy Efficiency and Conservation Act (EECA) 2024 and the latest DOSH (JKKP) safety amendments. Since the full enforcement of the act on January 1, 2025, any structural distortion during rigging is a statutory liability—if the casing is "racked" or joints are compromised, the resulting air leakage will prevent the building from meeting its mandatory Energy Intensity Label.

At EKG (Malaysia) SDN BHD, our rigging protocols ensure that every mechanical unit is transitioned from the delivery bay to the plinth with the precision required to remain Sterile, Silent, and Statutory-Compliant.


1. Statutory Compliance: The 2026 Lifting Framework

Following the transition from the old PMA system on June 1, 2024, all rigging and hoisting operations must satisfy the updated Occupational Safety and Health (OSH) Act 1994 amendments.

 

  • Certificate of Fitness (CF) via MyKKP: Every lifting appliance (cranes, hoists, spreader beams) must have a valid CF visible on the MyKKP portal. Using uncertified rigging gear is a violation that can result in fines up to RM 500,000.

     

  • Competent Personnel: A legal rigging operation requires a DOSH-certified Lifting Supervisor, a certified Signalman, and a Rigger. At EKG, our lifts are further overseen by Mechanical Engineers to protect the internal alignment of the high-efficiency components.

     

  • Method Statement & HIRARC: A site-specific Hazard Identification, Risk Assessment, and Risk Control plan is mandatory, detailing the safe system of work for high-rise or restricted-access zones.

     


2. Specialized Rigging for Asset Integrity

Commercial mechanical units are sensitive thermal machines. Standard "choker" hitches can crush TB2 Thermal Break casings or flex internal IE5 EC Fan Walls, leading to "Energy Theft" through air leakage.

Specialized Gear Engineering Purpose Benefit
Certified Spreader Beams Ensures 100% vertical lift forces. Prevents side-loading and crushing of AHU/Chiller panels.
Synthetic Soft-Slings Non-marring, high-strength material. Protects powder-coated finishes and thermal gaskets.
Dynamic CoG Analysis Accounts for offset weight (coils/motors). Ensures the unit remains perfectly level during the hoist.
Tag Line Precision Dual-point synthetic tethering. Manages orientation in KL's urban "wind canyons."

3. The "Digital-to-Physical" Transition (2026)

As of January 1, 2026, the rigging process must be documented for the building's Digital Birth Certificate.

  • LOD 400 Path-of-Entry (POE): We utilize 3D simulations to verify that the unit will clear all structural beams and existing MEP services. This "Zero-Clash" approach prevents site delays and structural modifications.

  • Post-Rigging Stability Audit: Once "landed," we perform ultrasonic leak detection to confirm the lift did not compromise the unit's airtightness.

  • BIM LOD 500 Readiness: The as-installed rigging coordinates are uploaded to your building’s Digital Twin, providing the auditable evidence required for the mandatory 5-year periodic energy audit.


4. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: We are mechanical engineers who understand the thermodynamics of the assets we rig. We ensure your warranty remains intact by following manufacturer-specific lift points.

  • Urban Logistics Expertise: We manage all DBKL and PDRM permits for night-lifts and road closures in high-density areas like KLCC, TRX, and Bukit Bintang.

  • GITA Support: Our documented rigging and positioning reports serve as the technical proof needed to claim the 100% Green Investment Tax Allowance.

Is your mechanical rigging handled by a generalist or an HVAC specialist? Contact EKG (Malaysia) SDN BHD today for a professional Mechanical Unit Rigging & Positioning assessment.

Are you planning a rooftop lift for a new high-rise project, or is this a modular unit rigging for a restricted-access retrofit?

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us