请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

12-May-2026

Modular AHU On-site Implementation

In the 2026 engineering landscape of Malaysia, Modular AHU On-site Implementation has become the primary solution for high-density urban developments and retrofits with restricted access. Under the Energy Efficiency and Conservation Act (EECA) 2024, modular assembly is no longer just a logistical choice; it is a technical necessity to ensure that unit performance—even when assembled in tight quarters—meets the mandatory Building Energy Intensity (BEI) and Specific Fan Power (SFP) standards.

At EKG (Malaysia) SDN BHD, we manage modular implementations through a "Digital-First" assembly workflow, ensuring that your on-site built units are sterile, silent, and statutory-compliant.


1. The Modular Advantage: Logistics & Performance

Modular units are delivered as individual sections (fan modules, coil sections, filter banks) and assembled on-site. This is critical for 2026 projects in KL or Selangor where "Box-Drop" installations are impossible due to spatial constraints.

 

  • Precision Entry: We coordinate the "Break-down" of units to fit specific "Paths of Entry" (POEs), such as standard service lifts or narrow mechanical room corridors, documented in our LOD 400 BIM models.

  • Scalability: Modular design allows for future expansion. If a tenant’s cooling load increases, the modular chassis can be extended to include additional cooling coils or UV-C sterilization modules without replacing the entire unit.

     

  • Airtightness (Class L1): Unlike basic field assembly, our modular implementation utilizes high-integrity "tongue-and-groove" panel connections and medical-grade gaskets to ensure zero "energy theft" from air leakage.


2. On-site Assembly & Hookup Protocol

Our implementation team follows a rigorous sequence to ensure factory-level performance in a site environment.

Implementation Phase Key Technical Action Operational Benefit
Site Verification Laser-leveling of the structural base frame. Prevents frame stress and ensures silent, vibration-free operation.
Sectional Joining Installation of TB2 Thermal Break seals. Prevents exterior sweating and mold in Malaysia's high humidity.
Component Hookup Integration of IE5 EC Fan Walls. Ensures the unit meets the statutory SFP < 1.1 kW/m³/s limit.
Digital Integration BMS / EnMS sensor calibration. Enables real-time tracking for mandatory annual energy audits.

3. Statutory Compliance: EECA 2024 & BIM

As of January 1, 2026, every modular AHU implementation must be "Audit-Ready" to comply with the latest mandates from the Energy Commission (ST).

  • Verified SFP Reporting: During on-site commissioning, we perform Pitot-tube traversing to prove the unit operates within legal energy limits.

  • BIM Mandate (July 2025): For projects exceeding RM10 million, our implementation includes a verified LOD 500 Digital Twin. This provides an as-built record of every internal component, essential for the mandatory 5-year periodic energy audit cycle.

  • HSE & HIRARC: Following the 2026 DOSH (JKKP) guidelines, every modular implementation is preceded by a task-specific Hazard Identification, Risk Assessment, and Risk Control (HIRARC) plan to ensure safe on-site assembly.


4. The "Sterile and Silent" Handover

The goal of modular implementation is to achieve a "Factory-Pure" indoor environment.

  • Antimicrobial Sealing: We apply pharmaceutical-grade sealants to all internal coved corners, eliminating microbial "dead zones."

  • Acoustic Mapping: We verify that the modular unit meets the NC 30-35 noise profile required for Grade-A office tenants, ensuring the site-built joints do not create mechanical rattles.

  • Sterile Drainage: We verify a 1:100 slope toward the deep-seal P-trap to prevent stagnant water and "Sick Building Syndrome."


5. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: Our implementation teams are led by mechanical engineers, not just technicians, ensuring the thermodynamics of the site-assembled unit are flawless.

  • Zero-Clash Execution: We resolve 95% of spatial and logistical conflicts in our Virtual Design Review before the first module reaches the site.

  • EECA 2024 Experts: We provide the auditable documentation required to protect your building's energy license and secure your Energy Intensity Label.

Does your project require an AHU that "fits the room" without compromising 2026 energy standards? Contact EKG (Malaysia) SDN BHD today for a specialized Modular AHU On-site Implementation assessment.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us