请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

13-Apr-2026

Kitchen Duct Degreasing: BOMBA Kitchen Duct Inspection by EKG M&E Sdn Bhd

In 2026, a BOMBA Kitchen Duct Inspection is the primary "Mechanical Audit" required to validate the fire resilience of your F&B facility. Under the Uniform Building By-Laws (UBBL) and MS 1472, BOMBA (Jabatan Bomba dan Penyelamat Malaysia) requires that kitchen exhaust systems be physically inspectable to ensure they are not acting as "Grease Fuses." For properties in Kuala Lumpur and Selangor, failing this inspection can lead to the immediate suspension of your annual Fire Certificate (FC).

At EKG M&E Sdn Bhd, we apply 34 years of mechanical engineering expertise to conduct pre-audit inspections and remediation. We ensure your system is compliant, safe, and optimized for a 5-Star Energy Intensity Label under the EECA 2024.


1. The Engineering Logic: The "Inspectability" Mandate

A kitchen duct cannot be safe if it is "Invisible." BOMBA's primary concern during an inspection is whether the maintenance team can prove the duct is free of combustible grease throughout its entire run.

  • Fuel Load Verification: The inspector will look for "Heavy Grease Accumulation" (>0.05 mm) which serves as a fuel source for fire propagation.

  • Structural Fire Integrity: The inspection verifies that the duct maintains its fire rating (typically 2 to 4 hours) as it passes through different fire compartments.

  • Mechanical Efficiency (BEI): While BOMBA focuses on safety, an inspection also identifies "Energy Bleed" points. Leaky joints or grease-clogged fans increase static pressure, forcing your Variable Frequency Drives (VFDs) to work harder and inflating your Building Energy Index (BEI).


2. Key BOMBA Inspection Checkpoints

Our pre-inspection audit follows the exact protocol used by BOMBA officers to ensure 100% compliance:

A. Access Panel Frequency and Placement

The most common point of failure is a lack of access. BOMBA 2026 standards require a Fire-Rated Access Panel at every 3 meters of horizontal run and at every change of direction. During our inspection, we map these points; if they are missing or hidden behind a ceiling, we remediate them using UL-Listed panels.

B. The "Bare-Metal" Visual Test

Inspectors will open random access panels to check for "Clean-to-Metal" status. If liquid grease or carbonized "cake" is found, the system fails. We utilize robotic borescope cameras to provide you with a full 360-degree digital map of your duct interior before the official audit.

C. Fire Damper and Fusible Link Testing

BOMBA will verify that all fire dampers within the kitchen exhaust path are functional. We test the Fusible Links and actuators to ensure the damper will slam shut if temperatures exceed the safety threshold, preventing the fire from moving into the main building riser.


3. Compliance Matrix: BOMBA 2026 Readiness

Inspection Criteria Failure Condition EKG Compliance Standard
Maintenance Access No panels / Hidden panels Mapped & Remediated every 3m
Grease Load > 0.05 mm accumulation Restored to Bare-Metal (IKECA)
Joint Integrity Leaking liquid grease Sealed to DW143 Class C
Documentation No service history Digital Service Dossier Provided
EECA 2024 Status High Static Pressure Optimized for 5-Star BEI

4. Why Professional Inspection is Essential for 2026

  • FC Renewal Security: The Fire Certificate is your "License to Operate." We provide the certified post-inspection report and material fire-certificates that prove your system is maintained to MS 1472 standards.

  • Lowering TNB Maximum Demand: An inspection often reveals grease-choked fans and dampers. By identifying these "Mechanical Chokepoints," we help you restore the aerodynamic efficiency of the system, reducing peak power charges.

  • Bio-Security (DOSH 2026): Grease buildup is a primary source of bacterial growth and foul odors. Our inspection ensures your facility stays below the legal 500 cfu/m³ bacterial ceiling, protecting your brand and your occupants.

Why Choose EKG M&E Sdn Bhd?

  • 34 Years of Engineering Depth: Based in KL, we understand the "Mechanical Forensics" of high-rise exhaust systems. We don't just "look"; we engineer solutions for non-compliant setups.

  • Turnkey Safety Dossier: You receive a comprehensive digital audit, including "Before and After" photos, a map of all access points, and a certified technician's sign-off.

  • BIM Integration: We can update your 3D digital twin with the final inspection results and access panel locations, allowing your facility team to manage future maintenance with 100% accuracy.

Is your kitchen exhaust system ready for a BOMBA audit or is it a hidden liability? Contact EKG M&E Sdn Bhd today for a specialized BOMBA kitchen duct inspection and secure the safety and compliance of your building.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us