请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

26-Mar-2026

Building Air Intake Service | 2026 Fresh Air Injection Standards

In 2026, a Building Air Intake Service is the critical first stage of a "Fresh Air Injection" strategy. Under the DOSH ICOP IAQ 2026 and the EECA 2024, the air intake is no longer viewed as a passive vent but as a high-performance gateway that must be actively managed to prevent outdoor pollutants (haze, vehicle exhaust) from entering the building.

At EKG M&E, we leverage 34 years of mechanical engineering to ensure your air intake systems are clean, balanced, and energy-optimized to meet Malaysia's latest federal mandates.


1. 2026 Compliance: The DOSH "Source Protection" Rule

Under the updated DOSH 2026 standards, the "freshness" of your air injection depends entirely on the hygiene of the intake point. Our service protocols are designed to meet these mandatory requirements:

  • Location Audit: We verify that your intake is not drawing in "short-circuited" exhaust from your own building or neighboring cooling towers.

  • Multi-Stage Filtration (MERV-13+): In 2026, standard mesh filters are insufficient for urban KL. We install and service MERV-13 to MERV-15 high-efficiency filters to block the PM2.5 particulates and seasonal haze that can bypass older systems.

  • Microbial Decontamination: We treat intake louvers and internal plenums with anti-microbial coatings to prevent "Sick Building Syndrome" caused by mold growth in Malaysia’s high-humidity environment (>70% RH).


2. EECA 2024: Energy-Efficient Intake Management

The EECA 2024 requires building owners to monitor and reduce their Building Energy Index (BEI). A neglected air intake is a major source of energy waste.

  • Differential Pressure (DP) Monitoring: We install digital DP sensors that alert your BMS when filters are "loaded." This prevents your fan from working harder than necessary to pull air through a clogged intake.

  • VFD Recalibration: After every intake service, we retune the Variable Frequency Drive (VFD).

  • The Cube Law Advantage: By ensuring the intake is free of obstructions, the fan can run at a lower RPM to achieve the same airflow. Following the Cube Law, reducing fan speed by 20% results in a nearly 50% reduction in power draw, directly improving your building's Energy Intensity Label.


3. Mechanical Health: FFT Vibration & Air Balancing

The air intake is the "lung" of your building. If it is restricted, the entire circulation system suffers.

  • FFT Vibration Audit: We use Fast Fourier Transform (FFT) analysis on the intake fan assembly. Unbalanced fans or loose louvers can create harmonic vibrations that travel through the ductwork, causing noise and mechanical fatigue.

  • Airflow Balancing: We use digital anemometers to verify that the "Injected" air volume meets the 10 l/s per person requirement. An imbalanced intake can cause Negative Pressure, which draws hot, humid, and unfiltered air into the building through cracks and doors.


4. 2026 Service Protocol: TR19® Air Standards

We follow the March 2026 TR19® Air update, the global benchmark for ventilation hygiene:

  • Digital Evidence: Our service includes "Before and After" high-resolution photography and Deposit Thickness Tests (DTT) to prove the intake is free of dust and debris.

  • Audit-Ready Reports: Every service ends with a comprehensive IAQ report featuring Laser Particle Counter data, confirming that the air being "injected" into your office is 100% clean and compliant with 2026 standards.


Why Trust EKG M&E for Air Intake Services?

  • 34 Years of Engineering Depth: We understand the physics of high-velocity air intake and its impact on your overall HVAC system.

  • Certified Technicians: Our teams are trained in the latest DOSH and BESA (TR19®) compliance frameworks.

  • Total System Synergy: We don't just clean the vent; we optimize the entire "Injection Path" from the louver to the occupant's desk.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us