请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

26-Mar-2026

Building CO2 Ventilation Control | 2026 Smart Infrastructure

In 2026, Building CO2 Ventilation Control is the cornerstone of Malaysian "Smart Building" engineering. Under the DOSH ICOP IAQ 2026 and the Energy Efficiency and Conservation Act (EECA) 2024, buildings are mandated to shift from "Constant Volume" to Demand-Controlled Ventilation (DCV). This technology uses CO2 as a real-time proxy for occupancy, ensuring that fresh air is delivered exactly where and when it is needed, preventing the energy waste of cooling empty spaces.

At EKG M&E, we leverage 34 years of engineering depth to provide Zero-Waste Ventilation systems that lower your Building Energy Index (BEI) while maintaining a healthy, high-productivity environment.


1. 2026 Compliance: The 1,000 ppm "Dynamic Ceiling"

While the DOSH 2026 framework sets a 1,000 ppm ceiling for Carbon Dioxide, the 2026 engineering standard follows ASHRAE 62.1-2025, which treats CO2 as a marker for human bioeffluents (body odors).

  • Differential Control: We target a concentration of no more than 700 ppm above the outdoor ambient level. Since Kuala Lumpur’s outdoor CO2 typically averages 420 ppm, your indoor target for "Optimal Comfort" is approximately 1,120 ppm.

  • Area-Based Minimums: Even when CO2 is low, the system maintains a minimum Area Outdoor Air Rate (Ra) to continuously flush out building-sourced VOCs from carpets and furniture.

  • Accuracy Mandate: Per 2026 codes, sensors must maintain pm 75 ppm accuracy and utilize Dual-Channel NDIR (Non-Dispersive Infrared) technology to prevent "sensor drift" over time.


2. EECA 2024: VFD Logic & The Cube Law

The EECA 2024 (enforced Jan 2025) makes DCV a financial necessity for commercial hubs in KL and Selangor. Cooling 32°C outdoor air is the single largest energy drain in a tropical building.

  • Variable Frequency Drives (VFDs): We install VFDs on Fresh Air Fans and AHUs. The VFD modulates the motor speed (Hz) in direct response to CO2 levels.

  • The Cube Law Advantage: Following the Cube Law, if your office is at 50% occupancy and the VFD reduces fan speed by just 20%, your power consumption drops by nearly 50%. On average, EKG clients see a 30% to 45% reduction in total HVAC energy costs after DCV implementation.


3. Core System Components (2026 Grade)

For a 2026-compliant installation, we utilize industrial-grade components designed for long-term stability:

Component Function 2026 Specification
NDIR CO2 Sensors Detects human-emitted CO2. Dual-channel, auto-calibrating (ABC logic).
VAV Actuators Adjusts the volume of air to specific zones. Digital feedback with NFC configuration.
VFD Controllers Modulates the main fan motor speed. High-efficiency IE4 or IE5 rated.
BMS Integration Centralized oversight and data logging. BACnet or Modbus protocol for 24/7 audit trails.

4. Mechanical Health: FFT Vibration Analysis

A DCV system is highly dynamic, frequently changing fan speeds to match occupant demand. This can introduce new mechanical risks.

  • Resonance Audits: We use Fast Fourier Transform (FFT) analysis to identify "Critical Frequencies"—specific RPMs where your ductwork or fan housing might rattle.

  • Harmonic Skipping: We program the VFD to "skip" these noisy frequencies during the ramp-up/down process. This ensures your ventilation control is not only energy-efficient but also acoustically "invisible" to your tenants.


Why Trust EKG M&E for Ventilation Control?

  • 34 Years of Engineering Depth: Malaysia's specialists in large-scale M&E strategy and high-performance air systems.

  • Audit-Ready Dashboards: We provide the Energy ROI Reports and CO2 Compliance Logs required for 2026 Green Building and DOSH certifications.

  • Full Lifecycle Support: From initial Airflow Traverse and Sensor Mapping to 2026-mandated Annual System Validation.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us