请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

24-Mar-2026

Statutory Car Park Air Change Rates by EKG M&E Sdn Bhd

In the urban developments of KL and PJ, maintaining the correct Air Change Rate (ACH) is a legal mandate, not a suggestion. These rates are governed primarily by the Uniform Building By-Laws (UBBL) and supported by ASHRAE and JKKP (DOSH) guidelines to ensure that enclosed basements remain safe from toxic vehicle emissions and life-threatening smoke.

EKG M&E Sdn Bhd specializes in the engineering and certification of these flow rates to ensure your building remains fully compliant with Malaysian law.


Mandatory Air Change Rates (ACH) in Malaysia

Under the UBBL 1984 and prevailing BOMBA requirements, car park ventilation systems must be designed to meet two distinct operational modes:

Mode Statutory Requirement Primary Purpose
General Ventilation 6 Air Changes Per Hour (ACH) Removal of Carbon Monoxide (CO) and Nitrogen Dioxide (NO_2) during normal traffic flow.
Smoke Spill Mode 10 Air Changes Per Hour (ACH) Rapid extraction of high-temperature smoke ($250^\circ\text$ for 2 hours) during a fire.

Note: For very deep or complex basements, local councils like DBKL or MBPJ may require a higher ACH or a detailed CFD Airflow Analysis to prove the effectiveness of the design.


Technical Requirements for Compliance

  • Make-Up Air (Fresh Air Supply)

    For every cubic meter of air extracted, fresh air must be introduced. Typically, the supply air is designed at 80-90% of the exhaust rate to maintain a slight negative pressure, preventing odors and smoke from leaking into lift lobbies or stairwells.

  • Carbon Monoxide (CO) Thresholds

    While the ACH is fixed for design, the operation is often demand-controlled. Per JKKP (DOSH) Occupational Health standards:

    • Time-Weighted Average (8-hour): Should not exceed 25 ppm.

    • Ceiling Limit: Fans must ramp to 100% capacity if levels hit 50 ppm.

  • Fire Priority Override

    The system's control logic must ensure that a fire signal from the Fire Alarm Monitoring System (FAMS) takes absolute priority. In this mode, any energy-saving Variable Frequency Drives (VFDs) must bypass all limits to hit the mandatory 10 ACH instantly.


How We Calculate and Verify ACH

  1. Volume Calculation: We calculate the "Gross Volume" ($V$) of the car park ($Area \times Height$).

  2. Required Flow Rate ($Q$):

    Q = (V x Required VCH)/60

    Where is the flow rate in m^3/min.

  3. Anemometer Testing: During a BOMBA Audit, we use calibrated digital anemometers to measure the actual velocity at the face of the exhaust fans and supply louvers to verify the mathematical model matches reality.


Why Statutory Compliance Matters

  • Annual Fire Certificate (FC) Renewal: BOMBA will not renew an FC if the smoke spill system fails to hit the 10 ACH mark during a functional test.

  • Liability & Insurance: In the event of an incident, proven "under-ventilation" can lead to the voiding of building insurance and heavy fines for the Joint Management Body (JMB) or Management Corporation (MC).

  • Occupant Health: Proper ACH prevents the buildup of carcinogenic particulates and ensures that security guards and residents are not exposed to chronic $CO$ poisoning.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us