请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

24-Mar-2026

Smoke Clearance Rate Testing by EKG M&E Sdn Bhd

In Malaysia, Smoke Clearance Rate Testing (often called the "BOMBA Cold Smoke Test") is the final and most critical hurdle for obtaining a Certificate of Completion and Compliance (CCC) for any basement car park. EKG M&E Sdn Bhd specializes in conducting these professional simulations to prove that your smoke spill fans can clear a specified area within the timeframes mandated by the Uniform Building By-Laws (UBBL).


The BOMBA Testing Procedure

The test is a live demonstration witnessed by officers from the Jabatan Bomba dan Penyelamat Malaysia. It verifies that the mechanical extraction system effectively manages smoke and maintains visibility for evacuation.

  • Smoke Generation: We utilize high-output industrial fogging machines (smoke guns) to fill a specific fire zone with thick, non-toxic artificial smoke.

  • Triggering the System: The smoke is allowed to accumulate until the BOMBA officers are satisfied with the density. The building’s Fire Alarm is then triggered, which must automatically switch the ventilation system from "Normal Mode" to "Fire Mode."

  • The 6-Minute Rule: Once the smoke spill fans are at full capacity, a timer is started. Per BOMBA standards, within 6 minutes, the smoke must be cleared sufficiently so that exit signs and lobby entrances are clearly visible from a distance (typically evaluated by the officer's judgment on-site).

  • Air Velocity Verification: Our technicians use calibrated anemometers to measure the air velocity at the exhaust intake and the "make-up" air points, ensuring the system hits the mandatory 10 Air Changes per Hour (ACH).


Key Tenability Criteria

During the audit, we measure several "tenability" factors to ensure the basement remains a safe environment for escaping occupants:

Criterion Standard Requirement EKG M&E Testing Method
Visibility Min. 10m at 2.5m height Visual check of illuminated exit signs during fogging.
Clear Layer Min. 2.0m - 2.5m from floor Laser measurement of the smoke-to-air interface height.
Clearance Time Under 6 Minutes Stopwatch synchronized with Fire Alarm trigger.
Fan Operation Run at 250 degree celcius for 2 hrs Verification of Class H motor certificates and FRC cabling.

Pre-BOMBA Audit Checklist

To ensure a "First-Time Pass," we perform a comprehensive pre-test audit covering:

  • Fan Sequencing: Verifying that supply fans and exhaust fans start in the correct order to avoid over-pressurizing the basement.

  • VSD Override: Ensuring the Variable Speed Drives (VSDs) bypass all energy-saving limits and "Run to Destruction" upon fire signal.

  • Damper Functionality: Testing that all motorized smoke dampers snap into the correct position (Open/Closed) without jamming.

  • Essential Power: Simulating a main power failure to ensure the fans successfully kick-over to the Emergency Generator within 30 seconds.


Why Choose EKG M&E Sdn Bhd for Smoke Testing?

  • "Never Argue with BOMBA": We understand the nuances of BOMBA inspections in KL and PJ. We act as your technical representative, explaining the engineering logic and ensuring all G10 (ACMV) and C-forms are perfectly documented before the officers arrive.

  • CFD Correlation: If your system fails a test, we don't just guess the fix. We use our CFD Airflow Analysis data to pinpoint where stagnant air pockets are occurring and reposition jet fans to correct the flow.

  • Turnkey Rectification: If a motor fails or a damper sticks during a pre-audit, our repair teams are on-site to fix it immediately, preventing costly delays to your building's opening date.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us