请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息

EKG Technical Update: Electrical Panel Component Modernization & Power Factor Correction

13-Feb-2026

EKG Technical Update: Electrical Panel Component Modernization & Power Factor Correction

Kuala Lumpur | February 13, 2026EKG M&E Sdn Bhd continues to demonstrate its multi-disciplinary expertise with the successful completion of a comprehensive electrical system overhaul. This project focused on the high-level maintenance and modernization of critical switchgear components within a main distribution board, ensuring system safety, operational reliability, and improved energy efficiency through power factor correction.


ELECTRICAL SYSTEM RESTORATION

Scope of Work: Component Replacement (Transformers, Contactors, Overloads) and Capacitor Bank Modernization

1. Problem Statement

Electrical panels are the central nervous system of any facility. Over time, heavy-duty components can experience thermal fatigue and mechanical wear:

  • Control Transformers: Inconsistent voltage output was affecting the reliability of the control circuit.

  • Contactors & Overloads: Pitted contacts and aged thermal overload relays increased the risk of motor failure and electrical arcing.

  • Capacitor Banks: Degraded capacitors were resulting in poor power factor readings, leading to potential utility penalties (Reactive Power Charges) and increased heat within the panel.

2. Technical Execution

Our electrical engineering team performed a systematic "strip-and-replace" procedure to restore the panel to its original design specifications:

  • Control Transformer Installation: Replaced aged transformers with high-efficiency units, ensuring a stable and isolated power supply for the panel’s logic and safety circuits.

  • Switchgear Modernization: Installed new, high-durability Contactors and Overload Relays. This prevents localized overheating and provides precise protection for the downstream motors and pumps.

  • Capacitor Bank Refurbishment: Replaced failing capacitor cells with new, high-specification units. This restoration is critical for maintaining a Power Factor (PF) close to unity (0.95–1.0), which optimizes the facility's electrical load and reduces current draw.

  • Testing & Validation:

    • Voltage Verification: Confirmed Phase-to-Phase Voltage stability (e.g., 415V/416V).

    • Amperage Audit: Verified that the amperage draw across all phases is balanced and within the rated limits of the new components.

    • Torque Testing: Every connection was checked for proper torque to prevent "hotspots" caused by loose wiring.


3. Project Outcome & Value Delivered

  • Improved System Stability: The new control components eliminate intermittent faults and ensure the mechanical equipment (pumps/HVAC) starts and stops reliably.

  • Energy Cost Reduction: By restoring the Capacitor Bank, the client will benefit from improved power factor, eliminating TNB/utility surcharges and reducing internal cable heat losses.

  • Enhanced Safety: Replacing aged overloads and contactors significantly reduces the risk of electrical fires and catastrophic component failure.


About EKG M&E Sdn Bhd

Headquartered in Kuala Lumpur, EKG M&E Sdn Bhd is a premier MEP specialist providing integrated solutions across mechanical, electrical, and plumbing sectors. Our team is dedicated to technical rigor, ensuring that every facility we manage operates with maximum efficiency and safety.

Is your electrical panel showing signs of heat damage or poor power factor? Contact us today for a professional electrical audit and a custom-engineered maintenance proposal.

总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us