请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Etepox Solution Sdn Bhd
Etepox Solution Sdn Bhd 201101019530 (947663-V)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
营业 休息
SSM
60122388020
erictoh855 WeChat QR
WeChat QR

Wechat ID: erictoh855

Installation Comparison: Epoxy Coating vs. Epoxy Self-Leveling

05-Aug-2025

Epoxy-based flooring is widely used in industrial, commercial, and even residential projects due to its durability, chemical resistance, and clean finish. Two common systems in this category are:
  • Epoxy Coating (Thin-Film Roll Applied)
  • Epoxy Self-Leveling (High-Build Flow Applied)
Though they share similar base materials, the installation methods and requirements for each are quite different. Below is a detailed comparison from floor preparation to final finish.

1. Surface Preparation (Common for Both)
Proper floor preparation is crucial for both systems to ensure adhesion and long-term durability.
Steps:
  1. Inspection of Substrate
    • Check for cracks, moisture, oil, laitance, or loose particles.
    • Moisture content should be <4% by CM test or per manufacturer's specs.
  2. Mechanical Grinding or Shot Blasting
    • Diamond grinding or shot blasting to open pores and remove contaminants.
    • Target surface profile: CSP 2–3 for coatings, CSP 3–5 for SL.
  3. Repair and Patching
    • Fill cracks, holes, and damaged areas using epoxy putty or mortar.
  4. Cleaning
    • Vacuum dust and debris. Ensure surface is dry and oil-free.

2. Epoxy Coating Installation (Thin-Film System)
System Overview:
  • Typically 0.3mm to 1.0mm thick
  • Applied with rollers or brushes
  • Designed for light-duty areas such as warehouses, showrooms, etc.
Installation Steps:
Step Description
Primer Apply a compatible epoxy primer (roller applied), typically 0.1–0.2mm. Cures for 6–12 hours.
Base Coat / Main Coat Apply 100% solids epoxy using roller or squeegee and back-rolled to even out. Thickness: 0.2–0.8mm. Can be one or two coats.
Optional Topcoat Optional polyurethane or UV-resistant clear coat may be applied for extra durability or aesthetics.
Tools:
  • Rollers (solvent-resistant)
  • Brushes for edges
  • Mixing paddles
  • Spiked shoes (for walking during wet application)
Cure Time:
  • Light foot traffic: 24 hours
  • Full mechanical: 3–7 days

3. Epoxy Self-Leveling Installation (High-Build Flowable System)
System Overview:
  • Thickness: 1.0mm to 5.0mm (typical is 2–3mm)
  • Applied using notched trowels and spike rollers
  • Designed for medium to heavy-duty areas like cleanrooms, pharma, food factories
Installation Steps:
Step Description
Primer Epoxy primer with good penetration to seal surface (roller applied). May require sand broadcast for intercoat adhesion.
Scratch Coat (optional) A thin levelling layer to fill minor surface imperfections before SL coat. Applied with a trowel.
Self-Leveling Layer Mixed 100% solids epoxy (often with fine fillers) poured and spread using notched trowel to desired thickness. Spike roller used to remove air bubbles.
Optional Topcoat Optional clear or pigmented PU or epoxy for additional resistance.
Tools:
  • Notched trowels
  • Mixing drill with helical paddle
  • Spike roller
  • Gauge rake (for thicker applications)
  • Spiked shoes
Cure Time:
  • Light traffic: 24–36 hours
  • Full cure: 5–7 days

4. Comparative Summary
Feature Epoxy Coating Epoxy Self-Leveling
Thickness 0.3 – 1.0 mm 1.0 – 5.0 mm
Application Method Rollers/brush Trowel + Spike Roller
Finish Thin film, visible texture of substrate Smooth, seamless, high-gloss or satin
Durability Light-duty Medium to heavy-duty
Installation Time Shorter Longer (more steps and curing)
Surface Imperfections May show through Covered/leveled by self-leveling layer
Cost Lower Higher (more materials & labor)
Slip Resistance Can add fine sand Can add anti-slip aggregates
Best Use Warehouses, corridors, car parks (light) Labs, pharma, F&B, showrooms

 Special Considerations
  • Moisture Tolerance: Use moisture-tolerant primer if substrate is not fully dry.
  • Temperature: Application temperature usually >10°C and <35°C.
  • Ventilation: Ensure good airflow, especially with solvent-based systems.
  • Safety: PPE is essential — gloves, goggles, masks (some systems may contain VOCs).

Conclusion
Choosing between Epoxy Coating and Epoxy Self-Leveling depends on:
  • Service Load (light vs. heavy traffic)
  • Aesthetic Requirements (smooth vs. textured)
  • Budget Constraints
  • Installation Time and Complexity
While epoxy coating is quicker and more economical for general applications, epoxy self-leveling provides superior durability, aesthetics, and long-term performance in demanding environments.
 
总办事处

Etepox Solution Sdn Bhd 201101019530 (947663-V)
27-6 & 27-7, Menara Mutiara Central, No. 2, Jalan Desa Aman 1, Cheras Business Centre, 56100 Cheras, Wilayah Persekutuan Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.etepox.com
网址: https://etepox.newpages.com.my/
网址: https://etepox.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • US 10657
  • GB 7670
  • CA 7169
  • AU 6773
  • IE 3631
  • NZ 3400
  • BR 1467
  • IN 755
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us