Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
KCK Sustainability Solutions Sdn Bhd
KCK Sustainability Solutions Sdn Bhd 202401039757 (1585604-V)

Heat Pump Installation

Heat Pump Installation

Scope:

  1. Site Assessment and Load Analysis

    • Evaluate cooling and heating load demands

    • Assess available chilled water and hot water systems

    • Identify heat recovery potential and integration points

  2. System Design and Equipment Selection

    • Recommend suitable heat pump capacity and configuration

    • Select model based on COP, flow rates, temperature lift, and control compatibility

    • Coordinate integration with chilled water plant or domestic hot water system

  3. Equipment Supply and Delivery

    • Provide high-efficiency water-to-water heat pumps with smart controllers

    • Supply associated accessories: flow switches, valves, sensors, expansion tanks, etc.

  4. Mechanical Installation

    • Install heat pump on proper foundation with vibration isolators

    • Connect chilled water and hot water piping with insulated, properly supported piping

    • Install necessary bypass valves, strainers, and Y-filters for flow control and protection

  5. Electrical and Control Works

    • Complete wiring for main power, pump starters, sensors, and BMS interface

    • Integrate with existing building automation or standalone control panels

    • Install temperature sensors and flow meters for monitoring and protection

  6. System Commissioning

    • Perform system start-up and testing

    • Verify temperature setpoints, flow rates, and pressure levels

    • Test heat recovery performance and safety controls

  7. Performance Tuning and Optimization

    • Fine-tune operation modes for maximum energy efficiency

    • Configure operation schedules and load sharing with existing HVAC systems

  8. Testing & Handover

    • Conduct reliability and functionality tests under live conditions

    • Provide as-built drawings, O&M manual, warranty documentation

    • Deliver client training on operation and routine maintenance


Applications:

  • Hotels & Resorts (hot water + cooling)

  • Hospitals & Clinics (constant hot water demand)

  • Factories & Laundries

  • Energy-efficient green buildings

  • Facilities with simultaneous heating and cooling loads

Pejabat Utama

KCK Sustainability Solutions Sdn Bhd 202401039757 (1585604-V)
34, Block C, Pusat Perdagangan Ion Medini 4, Persiaran Medini Sentral 5, Iskandar Puteri, 79600 Johor Bahru, Johor, Malaysia.

Tel:

Emel:
Laman Web: https://www.kck-ss.com
Laman Web: https://kck-ss.newpages.com.my/
Laman Web: https://kck-ss.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

  • US 6482
  • BR 4108
  • VN 3499
  • AU 1385
  • TH 1321
  • JP 1275
  • SG 958
  • MY 763
Orang dalam talian
Seni Jaya Logo
Brochure
Download
Our PackageContact Us