- Loading CRAC 100KW on site
- Loading CRAC Outdoor unit
- CRAC 100KW
- CRAC 100KW
- Loding CRAC LEVEL 1
- 100KW outdoor Copper piping work
- Indoor Copper piping work 100KW CRAC
- Accessories installation
- Indoor Welding Work
- Outdoor Welding work
- Final Position work CRAC 100Kw
- Final Position work CRAC 100Kw
- Final Position 100Kw 2 unit's
- cooling system vacuum tester 1.jpg
- cooling system vacuum tester 2.jpg
- CRAC Start Up Running
- Air Flow Testing