Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
L-Vision Engineering Pte Ltd
L-Vision Engineering Pte Ltd 202301018035 (200108045W)

Basic Engineering Design

Basic Engineering Design
Basic Engineering Design: Laying the groundwork for detailed design
In process industry, after the conceptual design phase, the project progresses to the Front-End Engineering Design (FEED)/Basic Engineering stage. This pivotal stage acts as a bridge between the initial concept and the subsequent detailed design. During the FEED stage, the process engineering undergoes refinement and expansion, focusing on optimizing process flow, equipment selection, and overall plant layout.

Objectives:
  • Develop a comprehensive project plan
  • Optimize process flow for efficiency
  • Identify and assess risks
  • Lay the foundation for the detailed engineering stage

Common deliverables:
  • Process flow diagram (PFD) with a high accuracy
  • Preliminary P&ID
  • More accurate equipment list
  • Equipment and instrument datasheets
  • More accurate cost estimate

Cost Accuracy:
  • Budget variance of approximately ±10-30% compared to the estimated budget

Flexibility to Modifications:
  • Still relatively high flexibility, but less than the conceptual design stage


Overall, the FEED and basic engineering stages establish the groundwork for a successful project outcome in process industry. Thorough planning, analysis, and documentation during these stages ensure a clear understanding of project goals and constraints, minimizing the risk of delays, cost overruns, and technical complications in later phases.

Pejabat Utama

L-Vision Engineering Pte Ltd 202301018035 (200108045W)
61, Bukit Batok Crescent, #06-07, Heng Loong Building, 658078, Singapore.

Tel:
Fax:

Emel:
Laman Web: https://www.l-vision.com
Laman Web: https://l-vision.newpages.com.my/
Laman Web: https://l-vision.onesync.my/

Pejabat Lain

Malaysia
No.16-C, Jalan Suarasa 8/4, Bandar Tun Hussein Onn, 43200 Cheras, Selangor, Malaysia.

Tel:
H/p:

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

  • US 18924
  • BR 15591
  • GB 11615
  • CA 9578
  • AU 8137
  • IE 3998
  • IN 2914
  • NZ 1992
Orang dalam talian
Seni Jaya Logo
Brochure
Download
Our PackageContact Us