- Checking VRV System and Replace Compressor at Sentosa 8 Foto
- Chemical Overhaul at HDB Woodlands 8 Foto
- Chemical Wash Compressor Unit at Tuas Area 3 Foto
- Install System 2 Aircond at Private House 3 Foto
- Air Conditioner Installation at HDB Hougang 4 Foto
- Installation Ceiling Unit in Tuas Area 5 Foto
- Installation Mini VRV in Tuas Area 3 Foto
- Installation VRV at Kim Teck rd Industry Area 4 Foto
- Chemical Wash Duct Unit at Condominium CBD 4 Foto
- Replace Indoor Control Board in Ang Mo Kio 3 Foto
- Replace Outdoor Condenser Unit and Testing Commissioning 3 Foto
- Replace PCB Board and Fan Motor at HDB Bukit Batok 3 Foto
- Check and Replace Water Pump Set 4 Foto
- Normal service at blk 325 clementi 2 Foto
- chemical overhoul at jurung west 4 Foto
- To Dismantled Water Trey To Replace Water Pump Set 5 Foto
- To Chemical Wash Outdoor Unit CU 2 Foto
- Install New VRV System At Condominiums 9 Foto
- To install New Pipe 2 Trip Job 4 Foto
- To Replace Fanmotor Set 4 Foto
- To Replace VRV Filter Dryer 4 Foto
- bukit batok st 22 6 Foto
- Service Fancoil Unit 6 Foto
- Re Vacuum System 2 Foto
- chemical Comppessor Unit At Ghim Moh Rd 2 Foto
- Chemical Overhoul In Condominium Bukit Batok 3 Foto
- Replace water pump set done at Ang mo Kio tested normal 4 Foto
- Complete the installation of System 1 at 23 Balmoral Park 4 Foto
- Complete the installation of System 2 at Tampines Street 6 Foto
- Complete the installation of System 2 at Serangoon ave 3 3 Foto
- FOC Site Survey Jurung 3 Foto
- Installation At Yishun 4 Foto
- Checking Aircon At Bukit Timah 9 Foto
- check vrv Daikin In Bukit Timah 4 Foto
- Normal Servicing At Bukit Timah 6 Foto
- normal service at bukit timah 2 Foto
- To Contact Service At Bukit Timah Area 5 Foto
- Servicing At Bukit Batok 5 Foto
- Chemical Overhaul At Bukit Batok 5 Foto
- Install New Airconditioning At Bukit Batok 4 Foto
- Aircon Service At Bukit Timah 3 Foto
- Tiada Kategori 50 Foto