Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
AMIYA ENERGY SDN. BHD.
AMIYA ENERGY SDN. BHD. 202401007698 (1553548-H)
Waktu
Pejabat
Isnin - Jumaat 8:00 AM - 5:30 PM
Sabtu - Ahad Closed
We′re closed on Public Holiday
Open Closed
Onesync Platinum + SSM
Jenis Perniagaan:

Perkhidmatan

Malaysian Government opens Fifth Large Scale Solar (LSS5) Competitive Bidding Process - AMIYA ENERGY SDN. BHD.

Malaysian Government opens Fifth Large Scale Solar (LSS5) Competitive Bidding Process

14-Jun-2024

Malaysia’s Energy Commission has kicked off the second quarter of 2024 with an announcement that Malaysia’s fifth Large Scale Solar competitive bidding process is open1. Known as ‘LSS-Peralihan Tenaga SuRia’ or ‘LSS PETRA’, this round of competitive bidding process sees a total capacity of 2,000MW being offered – more than double of the capacity that was offered under the previous round of the Large Scale Solar competitive bidding process.
 
FOUR SEPARATE PACKAGES UNDER LSS PETRA
 
There are four packages available under LSS PETRA. It has been reported in the media2 that the key features and criteria in relation to these packages will be as follows:
 
PACKAGE KEY FEATURES KEY BIDDER CRITERIA
Package 1
 
  • For rooftop or ground-mounted solar projects.
  • Quota of 250MW.
  • Permitted generation capacity is between 1MW – 10MW.
  • Company or consortium incorporated in Malaysia.
  • 100% Bumiputera equity.
  • Bumiputera company rating with the Ministry of Finance.
  • Registered as a Small and Medium Enterprise (SME) with SME Corporation Malaysia.
Package 2
 
  • For rooftop or ground-mounted solar projects.
  • Quota of 250MW.
  • Permitted generation capacity is between 10MW – 30MW.
  • Company or consortium incorporated in Malaysia.
  • Minimum 51% Bumiputera equity.
  • Bumiputera company rating with the Ministry of Finance.
  • 100% local Malaysian equity.
Package 3
 
  • For rooftop or ground-mounted solar projects.
  • Quota of 1,000MW.
  • Permitted generation capacity is between 30MW – 500MW.
 
  • Company incorporated in Malaysia with minimum 51% local Malaysian equity.
  • Consortium with at least one member being a company incorporated in Malaysia and with minimum 51% local Malaysian equity.
Package 4
 
  • For floating solar projects.
  • Quota of 500MW.
  • Permitted generation capacity is between 10MW – 500MW.
 
All solar projects under LSS PETRA are scheduled to commence operations by year 2026.
 
SUBMISSION OF PROPOSAL FOR LSS PETRA
 
The Request for Proposal for LSS 5 is available for purchase from 1 April 2024 until 5:00 p.m. on 15 April 2024. Such purchase can be made online via the Energy Commission’s website3 and at the price of RM3,000.
 
Submissions of proposals should be made physically to the Energy Commission no later than 5:00 p.m. on 25 July 2024. The criteria in relation to the bidder, participation in LSS PETRA and the contents of the proposal are set out in detail in the Request for Proposal.
 
SUNNY DAYS AHEAD FOR THE RENEWABLE ENERGY SECTOR
 
LSS PETRA is part of the Government’s ongoing efforts to achieve 70% RE installed capacity and carbon neutrality by 2050. The large capacity being offered is a significant step for the adoption of solar energy in the country and will no doubt contribute towards Malaysia’s clean energy transition.
 
In addition, it is pertinent to note that LSS 5 stipulates minimum Bumiputera and local Malaysian equity requirements, evidencing the Malaysian Government’s intention to increase local participation in the RE sector. This will be a particularly good opportunity for SMEs to venture into the RE sector.
 
Given the above, and taking into account that the maximum aggregated capacity for each bidder will be increased from 50MW to 500MW4, it is expected that the response to LSS PETRA will be very positive. It has been three years since the last Large Scale Solar competitive bidding process, and it would seem that it could have been worth the wait.

Source: https://www.skrine.com/insights/alerts/april-2024/malaysian-government-opens-fifth-large-scale-solar

 
Pejabat Utama

AMIYA ENERGY SDN. BHD. 202401007698 (1553548-H)
Lot No. 01-06, First Floor, Tropika Welcome Centre, No. 10, Jalan Setia Tropika 1/21, Taman Setia Tropika, 81200 Kempas, Johor Bahru, Johor, Malaysia.

Tel:

Emel:
Laman Web: https://www.amiya.energy
Laman Web: https://amiya.newpages.com.my/
Laman Web: https://amiya.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

  • BR 18744
  • US 10316
  • VN 6569
  • TR 2077
  • CN 1776
  • CA 1597
  • AU 1585
  • TH 1476
Orang dalam talian
Seni Jaya Logo
Brochure
Download
Our PackageContact Us