Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                16342
BR                                16342                             VN                                7549
VN                                7549                             US                                2429
US                                2429                             CN                                1684
CN                                1684                             AR                                1560
AR                                1560                             MY                                1227
MY                                1227                             EC                                781
EC                                781                             SG                                648
SG                                648                             
         
        