Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
PENGUNJUNG

12-May-2026

Smoke Extraction AHU System Design: Statutory Standards 2026

In the 2026 Malaysian engineering landscape, Smoke Extraction AHU System Design (commonly referred to as Smoke Spill Systems) is governed by the Uniform Building By-Laws (UBBL) 2026 and MS 1780:2017/2026. These systems are specialized life-safety assets designed to remove smoke from fire zones—such as large open-plan offices, malls, or basements—to maintain tenable conditions for evacuation.

At EKG (Malaysia) SDN BHD, we design these systems to be Sterile, Silent, and Statutory-Compliant, ensuring they function as high-performance extraction units during an emergency.


1. The Design Mandate: Extraction vs. Purging

As of February 3, 2026, JBPM (BOMBA) requires a clear distinction in the design phase between systems intended for active fire fighting and those for post-fire cleanup.

  • Extraction Rate: Under MS 1780, a smoke extraction system must provide a minimum of 10 Air Changes Per Hour (ACH) for the largest fire compartment it serves.

  • Temperature Rating: The entire air path—including the fan, motor, and casing—must be certified to operate at 250°C for a minimum of 120 minutes (FRP 120).

  • Pressure Management: The design must ensure that the extraction does not create a pressure differential so high that occupants cannot open exit doors (typically limited to 110N of force).


2. Core Engineering Components

A Smoke Extraction AHU differs significantly from a standard cooling unit in its materiality and fail-safe logic.

Component 2026 Engineering Standard Purpose
High-Temp Motor Class H Insulation / IP55 Ensures the fan continues to run even as the ambient air reaches 250°C.
Fire-Rated Ducting MS 2586:2026 (1.2mm min) Prevents duct collapse and ensures smoke is vented safely out of the building.
VFD "Fire Mode" Hard-wired Override Bypasses all internal thermal protection to keep the fan running until structural failure.
Fire Dampers MS 558:2024 Certified Note: Traditional fire dampers are typically omitted in smoke spill paths to prevent accidental closure during extraction.

3. Functional Design Sequence (The "Kill-Signal" Protocol)

The integration with the Fire Alarm Monitoring System (FAMS) is the most critical aspect of the design:

  1. Detection: A signal is received from the building's fire panel or localized Duct Smoke Detectors.

  2. Comfort AC Shutdown: All standard AHUs receive an Automatic Fire Signal AHU Shut-off to stop the spread of smoke.

  3. Extraction Initiation: The Smoke Extraction fan ramps up to 100% capacity within 60 seconds.

  4. Make-Up Air Interlock: Motorized fresh air louvers or dedicated make-up air fans must activate to replace the extracted air, preventing a vacuum effect.


4. Statutory Commissioning & AHU Safety Permit

To finalize the design, EKG engineers coordinate the official witness test with BOMBA:

  • Smoke visualization Test: Using non-toxic smoke bombs to verify the effective extraction path and ensure no "dead zones" where smoke could accumulate.

  • Static Pressure Audit: Verification that the fan can overcome the resistance of fire-rated ducting and high-temperature louvers.

  • Digital Twin Handover (LOD 500): Design parameters and commissioning logs are uploaded to the building’s Digital Birth Certificate for the 5-year periodic statutory audit.


5. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: Our designs are led by mechanical specialists who understand the complex relationship between thermodynamics, fluid dynamics, and active fire protection.

  • EECA 2024 Alignment: We utilize high-efficiency axial or centrifugal fans that meet energy benchmarks during non-emergency "Air Purge" cycles.

  • GITA Support: Documented compliance with 2026 BOMBA standards is essential for claiming the 100% Green Investment Tax Allowance.

Is your smoke extraction system a life-safety asset or a statutory liability? Contact EKG (Malaysia) SDN BHD today for a specialized Statutory Smoke Extraction System Design Review.

Hantar mesej anda ke EKG M & E SDN BHD
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.eakon.com.my
Laman Web: https://eakon.newpages.com.my/
Laman Web: https://eakon.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us