Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
PENGUNJUNG

24-Mar-2026

Data Centre PUE Optimization by EKG M&E Sdn Bhd

In the high-humidity, high-heat environment of Kuala Lumpur, Power Usage Effectiveness (PUE) is the ultimate metric for operational success. PUE is defined as the ratio of the total power entering the facility to the power actually consumed by the IT equipment.

$$PUE = \frac{\text{Total Facility Energy}}{\text{IT Equipment Energy}}$$

As of 2026, MITI and JKKP (DOSH) have intensified sustainability guidelines, pushing for a design PUE limit near 1.2 to 1.5 for new facilities in Malaysia. Since cooling typically accounts for 30% to 40% of non-IT energy, EKG M&E Sdn Bhd focuses on precision HVAC and VFD strategies to drive your PUE toward the ideal 1.0.


1. The Strategy: Attacking the "Cooling Overhead"

To optimize PUE in a tropical climate, we eliminate "Bypass Air" (cold air that misses the servers) and "Recirculation" (hot air that cycles back into the intake).

  • Hot/Cold Aisle Containment: By physically separating air streams with rigid panels or thermal curtains, we can raise the "Supply Air Temperature" to 24°C–27°C (per ASHRAE TC 9.9). Every $1^{\circ}\text$ increase in supply air temperature can reduce chiller energy use by roughly 2% to 3%.

  • Airflow Calibration: We use CFD (Computational Fluid Dynamics) to place perforated floor tiles only where cooling is needed, ensuring the high-pressure plenum is optimized for the current rack density.


2. VFD-Driven Dynamic Cooling

Fixed-speed fans are the enemy of a low PUE. We utilize Variable Frequency Drives (VFDs) to turn your HVAC into a "demand-response" system:

Feature Standard Cooling VFD-Optimized Cooling
Fan Logic Runs at 100% Constant Speed. Ramps up/down based on underfloor pressure.
Energy Impact High baseline waste. Reduces fan power by up to 50% during low loads.
PUE Impact Static PUE (High). Dynamic PUE (Lower and more stable).
Reliability Mechanical jerks at startup. Soft-starts reduce belt/bearing wear.

3. Mechanical Plant Efficiency

Beyond airflow, we optimize the "Liquid Side" of the data centre to maximize heat rejection:

  • Chilled Water Plant Tuning: We manage the Delta-T ($\Delta T$) across your chillers. By ensuring a wide temperature difference between supply and return water, we maximize the efficiency of the heat exchange barrels.

  • Vibration Health Monitoring: We perform FFT Spectrum Analysis on all primary/secondary pumps and tower fans. High vibration creates friction and heat—wasted energy that drives up your PUE.

  • Water-Side Economization: In 2026, we utilize hybrid cooling towers that take advantage of cooler night-time "Wet Bulb" temperatures in KL to provide "free cooling," bypassing the energy-intensive chillers entirely.


4. Continuous Monitoring & AI-Logic

A low PUE is not a "set and forget" achievement. We integrate your system into a DCIM (Data Centre Infrastructure Management) dashboard:

  1. Real-Time PUE Tracking: Instant visibility into how a 10% increase in server load affects your cooling overhead.

  2. Predictive Maintenance: The VFDs report motor health data; if a fan starts drawing more amps, the system alerts us to a potential blockage or bearing failure before it hits your PUE.

  3. Sensor Density: We place NIST-traceable sensors at the top, middle, and bottom of racks to prevent "Hot Spots" without over-cooling the entire room.


Why Choose EKG M&E Sdn Bhd?

  • Compliance Experts: We help you meet the 2026 MITI Sustainability Guidelines for PUE and WUE (Water Usage Effectiveness).

  • 34-Year Legacy in KL: We understand the unique challenges of Malaysian humidity and grid stability.

  • Turnkey Execution: From the Raised Access Floor to the VFD control panels, we manage the entire efficiency loop.

Hantar mesej anda ke EKG M & E SDN BHD
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.eakon.com.my
Laman Web: https://eakon.newpages.com.my/
Laman Web: https://eakon.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us