Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
Green Energy Automation Sdn Bhd
Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
Business
Hours
Monday - Friday 9:00 AM - 6:00 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
Open Closed
Onesync AI SSM
60187891859
mychinkee WeChat QR
WeChat QR

Wechat ID: mychinkee

Business Nature:

Services Supplier

Energy Efficiency and Conservation Act (EECA) 2024 | GEASB - Green Energy Automation Sdn Bhd

Energy Efficiency and Conservation Act (EECA) 2024 | GEASB

02-Aug-2026

In Malaysia's industrial, energy, and smart building sectors, REA (Registered Energy Auditor) and GEASB function as strategic partners, creating a seamless division of labor between regulatory consulting and turnkey engineering execution.
Here is the structured breakdown of their core roles, compliance duties, and collaboration framework under Malaysian regulations:
Core Responsibility Matrix
Stage / Function REA (Registered Energy Auditor) GEASB (System Integrator / Engineering)
Legal Compliance 100% Responsible. Conducts statutory audits and official sign-offs under the Energy Commission (ST) and EECA guidelines. Technical Alignment. Delivers equipment certificates and data to meet compliance standards.
Data Acquisition Defines Data Scope. Designs baseline metrics and Measurement & Verification (M&V) requirements. Physical Deployment. Installs sensors, power meters, configures PLC/SCADA, and pipelines live data.
Control Optimization Theoretical Strategy. Models energy savings and identifies process inefficiencies through simulation. Execution & Logic. Programs automation algorithms, fine-tunes VFDs, and deploys closed-loop controls.
ESM Implementation ROI & Carbon Accounting. Financial modeling, payback calculations, and carbon reduction forecasting (MGTC standards). EPC Contractor. Handles electrical retrofitting, automation upgrades, and long-term asset maintenance.

End-to-End Project Workflow
1. Audit & Compliance Phase (REA Led)
  • Official Sign-off: The REA conducts energy audits required for high-energy consumers in Malaysia. They prepare, verify, and officially sign off on reports submitted to the Energy Commission (Suruhanjaya Tenaga - ST) under the Energy Efficiency and Conservation Act (EECA).
  • Baseline Calculation: The REA calculates the exact Energy Saving Potential and establishes the energy baseline using engineering formulas.
2. Site Automation & Data Activation (GEASB Led)
  • Electrical & Automation: GEASB takes over on-site operations. They retrofit traditional electrical panels, switchgears, and motor control centers (MCC).
  • Data Acquisition (DAQ): GEASB deploys edge gateways, industrial IoT (IIoT) protocols, and SCADA systems to capture live parameters like voltage, current, pressure, and flow rates.
  • Control Optimization: They write the automation logic to ensure heavy machinery operates at optimal efficiency, eliminating idle power waste.
3. Post-Audit ESM Execution (Joint Collaboration)
  • The REA designs the M&V (Measurement and Verification) plan following international IPMVP standards to ensure real-world savings can be legally verified.
  • GEASB acts as the Engineering, Procurement, and Construction (EPC) partner. They convert the REA's audit recommendations (e.g., chiller plant optimization, air compressor scheduling) into active hardware and software control codes.

To help you tailor this workflow for your business operations in Malaysia:
  • Do you need details on the latest EECA (Energy Efficiency and Conservation Act) compliance thresholds for energy consumers?
  • Are you looking for specific smart metering or PLC integration standards required for Malaysian factories?
Please share your facility type (e.g., semiconductor plant, glove factory, commercial tower) so GEASB can provide more relevant technical insights.
Main Office

Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
No. 2, Jalan Selatan 3/2, Taman Perindustrian Ringan Pulai, 81300 Skudai, Johor, Malaysia.

Tel:

Email:
Website: https://www.geasb.com
Website: https://geasb.newpages.com.my/
Website: https://geasb.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us