Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN. BHD.
EKG M & E SDN. BHD. 201201033712 (1018200-D)
Business
Hours
Monday - Friday 9:00 AM - 5:30 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
We′re closed on Public Holiday
Open Closed

HVAC SYSTEM RESTORATION IN KUALA LUMPUR

10-Feb-2026

 HVAC SYSTEM RESTORATION

Scope of Work: Cooling Coil Replacement, Butterfly Valve Installation, and Pipe Freezing

1. Problem Statement

The existing HVAC infrastructure showed significant signs of thermal inefficiency and mechanical failure.

  • Cooling Coil: Heavy fouling and fin degradation reduced heat transfer capabilities.

  • Butterfly Valve: The isolation valve was seized, preventing system regulation.

  • Piping: System constraints required a valve replacement without a full building drain-down.

2. Technical Execution

To ensure zero operational downtime, the following procedures were implemented:

  • Cryogenic Pipe Freezing: Utilized liquid nitrogen to create a localized ice plug, isolating the work area while maintaining system pressure elsewhere.

  • Butterfly Valve Replacement: Removed the seized component and installed a high-performance lug-style valve for precise flow control.

  • Cooling Coil Installation: Swapped the degraded unit with a high-efficiency coil to restore optimal airflow and thermal exchange.

3. Project Outcome

  • Operational Efficiency: 15% increase in thermal performance.

  • Maintenance: Restored full isolation capabilities for future service.

  • Downtime: 0% building-wide interruption achieved through pipe-freezing technology.

Main Office

EKG M & E SDN. BHD. 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Email:
Website: https://www.ekg.com.my
Website: https://ekg.newpages.com.my/
Website: https://ekg.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us