Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Business
Hours
Monday - Friday 9:00 AM - 5:30 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
VISITORS

13-Apr-2026

Fire Damper Drop-Test Documentation by EKG M&E Sdn Bhd

In 2026, Fire Damper Drop-Test Documentation is the primary technical evidence required to secure your building's annual Fire Certificate (FC). Under the Energy Efficiency and Conservation Act (EECA) 2024 and updated BOMBA enforcement, a simple signature is no longer sufficient. Documentation must prove a functional "Fail-Safe" closure, verifying that each damper provides a 100% smoke seal while maintaining a 5-Star BEI during normal hours.

At EKG M&E Sdn Bhd, we apply 34 years of mechanical engineering expertise to provide BOMBA-Ready digital audit trails. We ensure your documentation is technically robust, compliant with MS 1472, and audit-proof.


1. The Engineering Logic: The "Proof of Closure"

Drop-test documentation is a forensic record of a damper's mechanical ability to transition from "Full Open" to "Airtight Seal."

  • Closure Timing Verification: As per AS 1851.6, a fire damper must seal in under 20 seconds. Our documentation records the exact closure speed, ensuring the spring-return or gravity-fall mechanism can overcome tropical "Blade Binding" caused by Malaysia's humidity.

  • Visual Evidence (Photo Logs): We provide high-resolution "Before" (Damper Open/System Efficient) and "After" (Damper Closed/Safe) photos. This is the only way to prove a 100% seal was achieved without gaps, satisfying BOMBA 2026 inspection criteria.

     

  • Lowering the BEI: Documentation must confirm the damper returned to its "Full Open" position post-test. A "Lazy Damper" that remains 10% closed is an invisible energy drain. Verified documentation ensures zero static pressure obstruction, directly improving your Building Energy Index (BEI).


2. Mandatory Documentation Components (BOMBA 2026)

To satisfy Malaysian fire safety audits, each asset in our Digital Asset Register includes:

A. Unique Asset Identification (QR Tagging)

Every damper is assigned a unique ID. Our reports map these IDs to your building's floor plans, allowing BOMBA officials to verify any specific unit instantly. This creates a transparent life-safety map of your infrastructure in Kuala Lumpur or Selangor.

B. The "Integrity Checklist"

We document the physical health of critical components:

  • Fusible Link Status: Verification that the thermal trigger is clean, unpainted, and within its service life.

  • Blade/Pivot Condition: Confirmation that the tracks are free of "Induction Dust" and lubricated with non-petroleum, high-temperature grease.

  • Barrier Seal Verification: Evidence that the Expansion Gap is professionally sealed with SIRIM-certified intumescent fire-stopping.

     

C. Pass/Fail & Remediation Log

Any deficiency (e.g., slow closure, seized pivot, faulty actuator) is logged immediately. We provide a secondary "Rectification Report" once the repair is complete, ensuring your facility remains 100% compliant and audit-ready.


3. Compliance Matrix: Standard Log vs. EKG Digital Audit


4. Why Professional Documentation is Essential for 2026

  • Meeting Annual FC Requirements: BOMBA high-rise audits now require structured damper performance data. Our documentation provides the "Technical Passport" required for your Fire Certificate renewal.

  • Lowering TNB Maximum Demand: By documenting that every damper is fully open during business hours, we ensure your Variable Frequency Drives (VFDs) are not fighting invisible obstructions, flattening your building's energy profile.

  • Bio-Security & IAQ (DOSH 2026): Our documentation proves the cleanliness of the air path. By verifying that dampers are free of tropical mold and dust, we support the highest indoor air quality standards for your occupants.

Why Choose EKG M&E Sdn Bhd?

  • 34 Years of Engineering Depth: Based in KL, we are mechanical contractors who understand that a safe building is an efficient building. We don't just "drop" dampers; we engineer the data-driven safety network.

  • Turnkey Safety & Quality: All testing and documentation are performed to MS 1472 standards, ensuring your mechanical assets are durable, safe, and legal.

  • Digital Twin Ready: We provide full digital exports of our test data, which can be integrated into your building's 3D digital twin for real-time facility management and automated safety reporting.

Is your fire safety documentation 100% audit-proof, or is your facility a hidden legal and energy risk? Contact EKG M&E Sdn Bhd today for specialized fire damper drop-test documentation and secure the future of your infrastructure.

Are you preparing for an upcoming BOMBA Fire Certificate (FC) audit or do you require a comprehensive safety baseline for a new facility?

Send your message to EKG M & E SDN BHD
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Email:
Website: https://www.eakon.com.my
Website: https://eakon.newpages.com.my/
Website: https://eakon.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us