Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Business
Hours
Monday - Friday 9:00 AM - 5:30 PM
Saturday 9:00 AM - 1:00 PM
Sunday Closed
We′re closed on Public Holiday
Open Closed
SSM
VISITORS

26-Mar-2026

Fresh Air Injection System | 2026 Fleet Implementation

In 2026, a Fresh Air Injection System is the primary mechanical requirement for commercial compliance in Malaysia. Under the DOSH ICOP IAQ 2026 and the EECA 2024 (Energy Efficiency and Conservation Act), buildings can no longer rely on simple recirculation. These systems are designed to "inject" a verified volume of oxygen-rich outdoor air directly into the building's mixing plenum or occupied zones to dilute carbon dioxide, VOCs, and pathogens.

At EKG M&E, we leverage 34 years of mechanical engineering to ensure your injection system meets the mandatory 10 l/s per person threshold while maintaining a 5-star Energy Intensity Label.


1. 2026 Compliance: The DOSH "Injection" Mandate

Under the DOSH 2026 framework, "Fresh Air Injection" must be active, filtered, and digitally logged for federal audits.

  • Mandatory Dilution: Systems must provide a minimum of 10 liters per second (l/s) per person. This is the only recognized method to keep indoor $CO_2$ levels below the 1,000 ppm legal ceiling.

  • Haze-Grade Filtration: All 2026 injection points must be equipped with MERV-13 or MERV-14 filters. This ensures that during KL’s seasonal haze, the system isn't "injecting" outdoor PM2.5 particulates into the office.

  • Dynamic Purge Logic: The system must be capable of a "Pre-Occupancy Purge"—running at 100% fresh air for 2 hours before the work day begins to flush out accumulated toxins.


2. EECA 2024: The "Cube Law" Energy Strategy

The EECA 2024 requires building managers to minimize energy waste. Injecting 100% outdoor air is energy-intensive because it must be cooled and dehumidified. We solve this using Demand-Controlled Ventilation (DCV).

  • VFD Integration: We link the injection fans to Variable Frequency Drives (VFDs) controlled by real-time $CO_2$ sensors.

  • The Cube Law Advantage: Fan power consumption is proportional to the cube of its speed ($P \propto n^3$).

    • The Math: By reducing the fan speed by just 20% when occupancy is low, you reduce the power required by nearly 50%.

    • The Result: You maintain perfect air quality while slashing the energy cost of the "Fresh Air Injection" process, keeping your Building Energy Index (BEI) within federal limits.


3. Mechanical Health: FFT Vibration & Pressure Control

A fresh air injection system introduces new air masses that can disrupt a building’s pressure balance.

  • FFT Vibration Audit: We use Fast Fourier Transform (FFT) analysis during installation to ensure the high-static injection fans do not create harmonic vibrations in the ductwork or structure.

  • Positive Pressure Balancing: We tune the injection rate to be slightly higher than the exhaust rate. This creates Positive Pressure, which acts as an "Air Shield"—preventing hot, humid air and unfiltered dust from leaking into the building through cracks or lobby doors.

  • Acoustic Tuning: 2026 systems utilize sound attenuators to ensure that high-velocity fresh air injection remains silent, meeting the NC-35 noise rating required for Grade-A office environments.


4. 2026 Injection Infrastructure Components

Component Function in 2026 2026 Specification
Intake Plenum Captures outdoor air. Weather-proof louvers with bird/insect screens.
Filter Bank Purifies injected air. MERV-13 minimum (mandatory for urban KL).
VFD Fan Motor Drives the air injection. Inverter-rated with BMS communication (Modbus/BACnet).
Smart CO2 Sensors Directs the flow rate. NDIR technology with 5-year calibration stability.

Why Trust EKG M&E for Fresh Air Injection?

  • 34 Years of Engineering Depth: We understand the physics of high-velocity air movement and its impact on your chiller load.

  • Audit-Ready Reporting: We provide the Airflow Balancing Certificates and Energy ROI Projections required for your 2026 federal submissions.

  • Turnkey Retrofits: We can integrate a high-performance injection system into existing older buildings with minimal disruption.

Send your message to EKG M & E SDN BHD
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Email:
Website: https://www.eakon.com.my
Website: https://eakon.newpages.com.my/
Website: https://eakon.onesync.my/

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us