Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
VG Instruments (SEA) Sdn Bhd
VG Instruments (SEA) Sdn Bhd 903421-U
Featured Merchant
VISITORS
Business Nature:

Supplier

Selangor,Kuala Lumpur (KL),Kepong - Wastewater treatment in an automotive painting plant

06-May-2019

Wastewater treatment in an automotive painting plant

 

 

Process data

Medium
Painting wastewater, heavily mixed with solids
Measuring range
approx. 3.5 m
Medium properties
Tendency to buildup, strong foaming
Temperature conditions
Ambient temperature
Special requirements
Fast monitoring of the level
Container
Concrete tanks 5 x 8 m, max. filling height 3.5 m

Application

To provide a perfect finish on its vehicles, the traditional British sports car manufacturer Aston Martin has to make sure all processes in the paint shop run optimally. A substantial part of the overall system is the wastewater treatment. Any malfunction in the clarification process has a direct influence on the quality of the paint job. All wastewater is recycled in an environmentally-friendly closed circuit system. One of the most important parts of the wastewater treatment process is the settling tank, where the flushed-out solids are removed. Two powerful feed pumps fill the tank and simultaneously move the unpurified wastewater downwards. The tank is strongly aerated in order to intensify the separation process. The precipitated solids sink to the bottom. The clean, aerated water flows over an overfall into the downstream clarification stages and ultimately back into the paint shop for reuse. The precipitated solids are regularly pumped out of the settling tank and disposed of.


Send your message to VG Instruments (SEA) Sdn Bhd
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

VG Instruments (SEA) Sdn Bhd (903421-U)
12A, Jalan Dagang SD2/1G, Bandar Sri Damansara, 52200 Kepong, Kuala Lumpur, Malaysia.

Tel:
Fax:

Email:
Website: https://www.radartankgauging.com.my
Website: https://www.radarlevelmeasurement.com.my
Website: https://radartankgauging.newpages.com.my/
Website: https://radartankgauging.n.my/

1
Hello! Thanks for visiting my site. Please press Start button to Contact with Admin :)

Start

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • US 1148
  • CN 143
  • AP 130
  • MY 82
  • AU 42
  • GB 41
  • CA 32
  • DE 29
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us