Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
MSP Metrology (M) Sdn Bhd
MSP Metrology (M) Sdn Bhd 1043455-P
Business
Hours
Monday - Friday 8:30 AM - 6:00 PM
Saturday - Sunday Closed
We′re closed on Public Holiday
Open Closed
Onesync Platinum SSM
VISITORS
60167220677
+60167220677 WeChat QR
WeChat QR

Wechat ID: +60167220677

Johor,Ulu Tiram,Johor Bahru (JB),Penang,Selangor,Kuala Lumpur (KL),Taman Perindustrian Cemerlang,Shah Alam,Bayan Lepas,Singapore - Evocus Economic & Reliable Fully-Auto Video Measuring Machine EVE Series

07-Mar-2022

Evocus Fully-auto Video Measuring Machine provide high accuracy with less error measurement software and intelligent illumination by MSP Metrology (M) Sdn Bhd from Evocus Korea

 

Features

EVA Series

Economic & Reliable Fully-auto Video Measuring Machine


Accurate with High Stability
≤ 2.8 + L/200µm

Intelligent Illumination
8-divisions LED Ring Light

Auto Measurement
Fast Operation of Measurement

Auto-Focus
Reduce Time & Effort

Advance Software
EV Measuring

 


State-of-the-Art Structure

Equipped with high precision optical grating ruler with the accuracy of 0.001mm. High accuracy that comes with great stability.

High precision Grade 00 granite base and column, with stable expansion of the physical properties, to ensure high stability and accuracy.

Precision linear guide, grinding ball screw and three-axis servo motor to ensure smooth operation and precise positioning. The motor is noise-free during operation.

 

 


 


High Resolution Images and Intelligent Illumination

High definitive automatic continuous zoom lens and high resolution color digital camera, to ensure clear image without distortion.

With programmable 4-ring 8-division LED cold illumination and contour LED parallel illumination and internal intelligent light adjustment, it can automatic control the brightness of the light.

 

 


 

EV Measuring Software

Professional Measuring Software

EV Measuring is a professional multisensor measuring software which combined with the developers years of experience in the measuring and software research industry. The design principle is friendly operation, powerful function, high accuracy and stability, simple maintenance.

  • Excellent software architecture design and fully objectoriented, to ensure the software is stable and reliable.
  • Professional SPC statistical analysis software connected to measuring software, to realize that the data could automatically export to SPC database without manual operation.
  • With powerful edge finder algorithm, which can help to get the edge of the shadow or dark image and ensure high accuracy
  • Support with multiple language, no need to install language pack and change the software which is convenient to local customers.
  • The same model of software will be permanent free to update, it can help to reduce other trouble to customer.
  • The software could automatically recognize and measure line, circle, arc and other elements.

 


 

Specifications

Model EVE-3020 EVE-4030
X/Y-Axis Travel 300 x 200mm 400 x 300mm
Glass Table 340 x 240mm 440 x 340mm
Workbench 550 x 250mm 650 x 350mm
Dimension (W x D x H) 760 x 660 x 1700mm 1035 x 790 x 1750mm
Load Capacity 35kg 35kg
Net Weight 460kg 520kg
Z-axis Travel High Precision Linear Guide, working travel 200mm
X/Y/Z-Axis Resolution 0.001mm
X/Y-Axis Accuracy X/Y-Axis Accuracy: ≤ 2.8 + L/200 (µm); Z-Axis Accuracy: ≤ 5 + L/200 (µm) [L= Length (mm)]
Main Structure High Stability Grade 00 Granite
Grating Scale High Precision Grating Scale, with the accuracy of 0.001mm
Motor Three-axis Servo Motor; Optional: Joystick
Drive High Precision Light Rod and Guide Rail
Illumination System (Programmable) Surface: Stepless Adjustable 4-ring 8-division LED Cold Illumination
Contour: LED Parallel Illumination with Intelligent Adjustment and Control of Luminance
CCD HD Color CCD
Motorized Zoom Lens Automatic Zoom Stereo Lens
Magnification: 0.7X ~ 4.5X;  Video Magnification: 30X ~ 225X
Working Distance 90mm
Field-of-View 10.6 – 1.6mm;   Optional Lens 0.5X & 2X
Measuring Software EV Measuring
Power Supply 220V ±10% (AC) 50Hz

 


 

Optional Accessories

Touch Probe

After the equipment is installed with probe, it can be used to measure the following parameters:

  • Height, width, length
  • The angle between the two sides
  • Vertical angle of cone
  • Diameter of cylinder
  • Chamfer
  • Straightness, flatness, roundness, cylindricity
  • Verticality, parallelism, inclination, and so on.

 


 

Coaxial Light Source with Different Effect

Joystick

 

Part Accessories

4-ring 8-division LED Surface Illumination

LED Parallel Contour Illumination

Zoom Lens

Video Capture Card

CCD Camera

Calibration Glass Stage

Data Integration Box

Software Dongle

Workbench

Computer System

Linear Scale

AV Cable

Send your message to MSP Metrology (M) Sdn Bhd
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

MSP Metrology (M) Sdn Bhd (1043455-P)
10, Jalan Gemilang 9, Taman Perindustrian Cemerlang, 81800 Ulu Tiram, Johor, Malaysia.

Tel:

Email:
Website: https://www.mspmetrology.com.my
Website: https://mspmetrology.newpages.com.my/
Website: https://mspmetrology.onesync.my/

Other Office

KL/Shah Alam Branch
18-23A, Plaza Azalea, 6, Persiaran Bandaraya , Seksyen 14, 40000 Shah Alam, Selangor, Malaysia.

Tel:

Union Technologies Pte Ltd
71 Bukit Batok Crescent #07-11/12, Prestige Centre, Singapore 658071.

Tel:
Fax:

Penang Branch
73-3-1, Ideal@The One, Jalan Mahsuri, 11950 Bayan Lepas, Penang, Malaysia.

Tel:

1
Hello! Thanks for visiting my site. Please press Start button to Contact with Admin :)

Start

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

All Shop List from NEWSTORE in Malaysia

  • MY 996
  • US 432
  • CN 322
  • MD 39
  • JP 20
  • SG 17
  • CZ 12
  • IR 10
People Online
Brochure
Download
Our PackageContact Us