请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Mahagamy Consultancy And Advisory Sdn Bhd
Mahagamy Consultancy And Advisory Sdn Bhd 201601001273 (1172199-T)

15-May-2026

1. Course Header Information

Course Title: STEAM BOILER OPERATOR COURSE
Training Division: BOILER / JKKP/DOSH MANDATORY TRAINING
Duration: 4 DAYS
Venue Options: MAHAGAMY TRAINING CENTER BINTULU
Contact Hour Breakdown: Formal Class - 24 Hours
Practical - 6 Hours
Price / Promotional Price: Request a Quotation – Tell us your needs, and we’ll prepare a customised quote for you.

2. Core Content

Course Introduction: As you go through the training, you’ll start to see how different boilers work, get familiar with their key parts and safety features, and learn to spot when something isn’t right. By the end, you’ll feel more confident handling both real situations and exam questions related to boiler operations.
Learning Objectives: At the end of the course, the participant will be able to:
Understand boiler principles, types, components, and safety features
Learn legal requirements, safe operation, and commissioning procedures
Apply knowledge of water treatment, combustion, and maintenance practices
Prepare for the DOSH Steam Boiler Operator examination
Course Topics/Modules: Module 1: Introduction to Boilers
Module 2: Laws Related to Steam Boilers
Module 3: Steam Boiler Operations & Troubleshooting
Module 4: Boiler Water Treatment
Module 5: Combustion Fundamentals
Module 6: Steam Turbines Fundamentals
Module 7: Steam Boiler Maintenance
Module 8: Steam Boiler Failures & Q&A Session
Target Audience: Designed for individuals who intend to sit for the JKKP Boilerman Examination and fulfil the required DOSH eligibility criteria.

3. Methodology & Assessment

Training Methodologies  
a.Theory Session: Delivered through lectures, workshops, discussions, quizzes, and interactive Q&A sessions.
b. Practical Session: Site Visit, NDT and others
Assessment Criteria Upon completion of the course, participants may register for the JKKP Boilerman Examination (Grade 1 or Grade 2), subject to meeting DOSH requirements.

4. Certification & Compliance

Certification Type: Certificate of Attendance
Delivery Timeline: Certificate : Immediately after class

5A. Technical Boilerman G2

Eligibility: Citizenship Only for Malaysian
Eligibility: Academic Option 1: Minimum SPM or SKM Level 2 (or equivalent), with 2 years working experience in steam boiler operations

Option 2: SKM Level 3 in Steam Boiler, with 1 year relevant experience
Eligibility: Experience Refer to above as combined
Medical Fitness Certified medically fit by an Occupational Health Doctor (OHD) using the health examination form available in the MyKKP system.
Renewal Conditions To renew a Steam Boiler Operator (Grade 1 & 2) certificate, applicants must be actively working in boiler operations (verified by employer), be medically fit certified by an OHD via MyKKP, have a permanent employer, and have no offences or fraudulent registration under OSHA.

Renewal should be applied 3 months before expiry. Applications submitted more than 12 months after expiry will be treated as new registration with special assessment.

5B. Technical Boilerman G1

Eligibility: Citizenship Only for Malaysian
Eligibility: Academic Applicants who wish to attend the Boilerman Grade 1 (G1) course must:

a. Have at least 6 months of working experience in steam boiler operations as a Grade 2 Boilerman;
b. Obtain verification from the employer or a Grade 1 Steam Boiler Engineer for the above experience;
c. Attend the Boilerman Grade 1 training at a JKKP registered training provider; and
d. Pass the Boilerman Grade 1 examination at a recognized examination center.
Eligibility: Experience Refer to above as combined
Medical Fitness Certified medically fit by an Occupational Health Doctor (OHD) using the health examination form available in the MyKKP system.
Renewal Conditions To renew a Steam Boiler Operator (Grade 1 & 2) certificate, applicants must be actively working in boiler operations (verified by employer), be medically fit certified by an OHD via MyKKP, have a permanent employer, and have no offences or fraudulent registration under OSHA.

Renewal should be applied 3 months before expiry. Applications submitted more than 12 months after expiry will be treated as new registration with special assessment.

6. Inquiry Logistics

Number of Pax: In-House: 8 to 15 participants per session
Public: Runs with a minimum of 8 participants
Accreditation: DOSH Approved Training Program Registration Number:
发信息至 Mahagamy Consultancy And Advisory Sdn Bhd
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

Mahagamy Consultancy And Advisory Sdn Bhd 201601001273 (1172199-T)
26, 1st Floor, Lorong Lau King Howe 1, 96000 Sibu, Sarawak, Malaysia.

电话:

邮件:

其他办事处

Bintulu Branch
No. 20, Gateway Industrial Park, Lot 19021, Jalan Sibiyu, 97000 Bintulu, Sarawak, Malaysia

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us