请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Green Energy Automation Sdn Bhd
Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
营业 休息
Onesync AI SSM
60187891859
mychinkee WeChat QR
WeChat QR

Wechat ID: mychinkee

HSE GUIDE: Permit to Work (PTW)

09-Nov-2025

%Purpose:

The Permit to Work (PTW) system is a formal written procedure designed to control certain types of work that are identified as potentially hazardous. It ensures that proper consideration is given to the risks involved and that necessary safety precautions are implemented before the job begins.


%Key Objectives:

· To ensure that all hazardous works are carried out safely and under controlled conditions.

· To provide a clear communication link between site management, supervisors, and workers.

· To prevent unauthorized and unsafe work.

· To confirm that all safety measures, isolations, and inspections are completed before work starts.


%Types of Work Requiring a Permit:

1.    Hot Work (welding, cutting, grinding)

2.    Confined Space Entry

3.    Electrical Work

4.    Lifting Operations

5.    Excavation Work

6.    Work at Height

7.    Radiography and Pressure Testing


%Permit Procedure:

1. Application: The responsible person requests a permit, specifying the work details, location, and hazards.

2. Evaluation: The safety officer or competent person reviews the hazards and ensures all controls are in place.

3. Approval: The authorized person signs and issues the permit after confirming that all safety conditions are met.

4.Display: The valid permit must be displayed at the work location.

5.Monitoring: Continuous supervision and periodic inspection are required during the activity.

6.Closure: The permit is closed after verifying that the work is complete, the area is safe, and all isolations are removed.


%Responsibilities:

· Permit Issuer: Ensures the job is safe to begin and all precautions are followed.

· Permit Holder: Carries out the work in compliance with the permit’s conditions.

· Safety Officer: Monitors and audits the PTW system to ensure effectiveness and compliance.


%Remember:

A Permit to Work is not just a formality it is a critical control tool that prevents accidents, protects lives, and ensures safe work execution. Never start a high-risk job without a valid permit.

Copied


总办事处

Green Energy Automation Sdn Bhd 201201043627 (1028104-T)
No. 2, Jalan Selatan 3/2, Taman Perindustrian Ringan Pulai, 81300 Skudai, Johor, Malaysia.

电话:

邮件:
网址: https://www.geasb.com
网址: https://geasb.newpages.com.my/
网址: https://geasb.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • VN 15880
  • BR 12136
  • AR 6934
  • BD 6002
  • IQ 4414
  • CN 3667
  • PK 2947
  • EC 2548
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us