请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
SYK Solutions Plus Sdn Bhd
SYK Solutions Plus Sdn Bhd 201901020283 (1329612-D)
营业
时间
星期一 - 星期六 9:00 AM - 6:00 PM
星期日 休息
营业 休息
Onesync AI SSM

Milestone Project: Largest and Complex High-Rise Signage Installations - SYK Solutions Plus Sdn Bhd

Milestone Project: Largest and Complex High-Rise Signage Installations

04-Jun-2026

One of our most challenging and iconic projects is the CelcomDigi signage installation at Petaling Jaya HQ  of a massive 26,000mm tall corporate logo . This is not a standard signage job both the building façade and the scale of the signage pushed the limits of conventional installation methods.


Key Challenges

The building is a contemporary high-rise structure featuring a non-planar façade and complex architectural geometry, requiring engineered façade coordination for external installations such as large-format signage, which created major alignment and mounting challenges. Every fixing point required precise adjustment to ensure the signage sits correctly without distortion from different viewing angles.

In addition, the signage itself was extremely large and heavy, reaching the upper limit of material handling capability for this type of installation. This required careful planning for lifting, positioning, and load distribution on the structure.

This project demanded:

  • Detailed structural calculation and load analysis

  • Custom engineering solutions for non-flat façade conditions

  • Innovative installation methodology and sequencing

  • Strict wind load and safety consideration at high elevation


Time & Precision Requirement
Due to the complexity and scale, the installation process took almost 2 months to complete on-site. Every stage required precision—there was no room for error, as alignment and safety were critical at every step.
 

The CelcomDigi HQ signage stands as a clear example of how we handle projects that go beyond standard contractor capability. When buildings are complex, materials are large, and precision is critical, we combine engineering, safety, and high-rise expertise to deliver successful outcomes.

#celcomdigi #menaracelcomdigi #pj #largestbuildingsignage 
总办事处

SYK Solutions Plus Sdn Bhd 201901020283 (1329612-D)
2, Jalan KPB 4, Kawasan Perindustrian Budiman, 43200 Cheras, Selangor, Malaysia.

电话:

邮件:
网址: https://www.ssplus.com.my
网址: https://ssplus.newpages.com.my/
网址: https://ssplus.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us