Data Center Solutions and Cable Management. Best solution for cable work, protection and easy installation. No excavation required for extra cables or repairs. Cost savings: 7% for initial work, 48% for maintenance work. It is made from PE material with length up to 50m and weight 2kg/m. It has execellent compression strength, shock resistance, corrossion resistance, joint water-tightness, joint strength, workability and avaibility for curved installation. It features with less jointing work, good workability with weight, length and flexibility, moreover it is top runner for 50 years.




