Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                35284
BR                                35284                             US                                13932
US                                13932                             VN                                7613
VN                                7613                             MX                                3079
MX                                3079                             AR                                3044
AR                                3044                             GB                                3008
GB                                3008                             CN                                1889
CN                                1889                             CO                                1794
CO                                1794                             
         
        
 
        