Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                20821
BR                                20821                             VN                                12434
VN                                12434                             AR                                3149
AR                                3149                             US                                2647
US                                2647                             CN                                1817
CN                                1817                             EC                                1297
EC                                1297                             MY                                948
MY                                948                             RU                                852
RU                                852                             
         
        
 
        