Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                11615
BR                                11615                             VN                                6277
VN                                6277                             US                                4354
US                                4354                             AR                                1784
AR                                1784                             CN                                1314
CN                                1314                             SG                                681
SG                                681                             EC                                672
EC                                672                             GB                                501
GB                                501                             
         
        
 
        