Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                23206
BR                                23206                             VN                                10129
VN                                10129                             US                                6860
US                                6860                             MY                                5210
MY                                5210                             AR                                3051
AR                                3051                             MX                                1608
MX                                1608                             CN                                1327
CN                                1327                             GB                                1316
GB                                1316                             
         
        
 
        