Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                16919
BR                                16919                             VN                                8612
VN                                8612                             US                                6385
US                                6385                             AR                                2449
AR                                2449                             CN                                1135
CN                                1135                             GB                                1061
GB                                1061                             MX                                1045
MX                                1045                             EC                                1004
EC                                1004                             
         
        
 
        