Due to their critical role in the power system, protective relays should be acceptance tested prior to being placed in service and periodically thereafter to ensure reliable performance. In a normal industrial application, periodic testing should be done at least every 2 years in accordance with NFPA 70B 2016 (Recommended Practice for Electrical Equipment Maintenance).
Protective relay testing may be divided into three categories: acceptance testing, commissioning, and maintenance testing. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be determined by the equipment owner or system engineer.
Protect your power system now! Contact us via email at info@PQE.com.my.









 
            
             
             
		
 
            
 BR                                22005
BR                                22005                             VN                                11250
VN                                11250                             US                                2383
US                                2383                             AR                                2148
AR                                2148                             CN                                1702
CN                                1702                             EC                                1014
EC                                1014                             MY                                1003
MY                                1003                             SG                                834
SG                                834                             
         
        
 
        