请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
Onesync AI SSM
访客

27-Mar-2026

Staircase Pressurization System Commissioning | Life-Safety Validation by EKG

Commissioning a Staircase Pressurization System is the final, critical step in transforming a building from a "Construction Site" into a "Safe Occupancy." In 2026, BOMBA (Malaysian Fire Department) and UBBL (Uniform Building By-Laws) standards require precise atmospheric balancing. If the pressure is too low, smoke enters the stairs; if it is too high, the fire doors become impossible to open, trapping occupants inside.

As part of a Ventilation Systems Audit, EKG provides the rigorous Testing & Commissioning (T&C) required to prove your "Safety Envelope" is 100% compliant.


1. The Physics of the "Safe Haven"

To be commissioned as "Fit for Purpose," the staircase system must achieve three distinct aerodynamic targets:

  • The Pressure Shield (+50 Pa): With all doors closed, the staircase must maintain a positive pressure of 50 Pascals (pm 10%). This physically prevents smoke from "leaking" into the escape route.

  • The Force Limit (110N): We use a digital force gauge to ensure that even under full pressurization, the force required to pull open a fire door does not exceed 110 Newtons.

  • Airflow Velocity (1.0 m/s): When a door is opened, the fan must instantly compensate. We measure the "Blast" across the open doorway to ensure a minimum velocity of 1.0 meter per second, which acts as an air curtain against encroaching smoke.


2. The EKG "Total-Envelope" Commissioning Protocol

We go beyond simple "Fan Starts" to audit the entire volumetric performance of the building:

  • Multi-Floor Mapping: We measure the pressure on the ground, middle, and top floors simultaneously. This identifies the Stack Effect (hot air rising), which can cause the top of a KL tower to be over-pressurized while the bottom is unprotected.

  • VFD "Fire Mode" Parameter Lock: We audit the Variable Frequency Drive (VFD). We ensure it is programmed to "Run-to-Destruction," ignoring standard motor trips (like overheating) to prioritize human life over equipment protection.

  • Ductwork Integrity Audit: If the fan is at 100% speed but the stairs only hit 30 Pa, we use thermal imaging and ultrasonic leak detectors to find "Air-Thievery" in the shafts or duct joints.

  • Interlock Timing: We measure the seconds between the Fire Alarm signal and the fan reaching its "Steady State." Compliance requires a reliable response in under 60 seconds.


3. The Energy & Mechanical Impact: The Cube Law

A "Commissioned" system is also an efficient one. Many systems are left "un-tuned," running fans at maximum speed and wasting massive amounts of energy during mandatory monthly tests.

  • Friction Elimination: We identify "Parasitic Drag" from misaligned pulleys or tight bearings that force the motor to work harder.

  • The Logic: Because of the Cube Law, if we optimize the mechanical path so the fan can hit its 50 Pa target at 42Hz instead of 50Hz, the power consumption during testing drops by nearly 40%.


4. Commissioning Performance Matrix

Test Parameter Target Performance Safety Risk of Failure
Static Pressure 50 Pa (+/- 10%) Smoke Ingress (Low) / Stuck Doors (High)
Door Opening Force Max 110 Newtons Evacuation Blockage (Safety Hazard)
Air Velocity Min 1.0 m/s (Door Open) Smoke Backflow into Stairwell
Genset Changeover < 10 Seconds Total System Failure during Blackout
Motor Vibration < 2.8  mm/s Bearing Seizure during Emergency

5. Why Trust EKG for System Commissioning?

  • BOMBA Form G Support: We provide the comprehensive technical reports and "Witness Logs" required for your annual Fire Certificate (FC) renewal.

  • Mechanical Restoration Path: If you fail commissioning, we don't just walk away. We are experts in Mechanical Fan Overhauls, offering on-site dynamic balancing, bearing replacements, and motor repairs to get you to compliance.

  • VFD ROI Projection: We calculate the exact energy savings achieved by "Down-Speeding" your fan to its precision safety setpoint.

  • 2026 Technical Standards: We use the latest digital manometers and thermal cameras to ensure your building meets the latest UBBL and MS (Malaysian Standards) codes.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us