请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

27-Mar-2026

Fire Escape Ventilation Service | Pressurization Fan Maintenance by EKG

In high-rise structures, the Fire Escape Ventilation System is your building’s "Last Line of Defense." It consists of Staircase Pressurization Fans that keep escape routes clear of toxic smoke and Smoke Spill/Extract Fans that remove heat and fumes from lobbies. In 2026, these systems are under heavy scrutiny by BOMBA in Kuala Lumpur, as mechanical neglect often leads to "Door Jamming" (over-pressure) or "Smoke Ingress" (under-pressure).

As part of a Ventilation Systems Audit, EKG provides a specialized service protocol that ensures your fire escape routes remain a "Safe Haven" during an emergency.


1. The Physics of a Safe Exit

To be compliant with UBBL (Uniform Building By-Laws), your fire escape ventilation must achieve a precise atmospheric balance:

  • The Pressure Sandwich: The staircase must be at a higher pressure than the lobby, and the lobby must be at a higher pressure than the fire floor.

  • The "Magic" Number: You need a minimum of 50 Pascals of pressure in the stairwell. If it drops to 20 Pa, smoke enters. If it hits 100 Pa, a child cannot pull the door open to escape.

  • The Stack Effect: In KL's tall towers, hot air naturally rises, creating a vacuum at the bottom and pressure at the top. A "Service" must calibrate the fans to overcome this natural phenomenon.


2. The EKG "Safe-Path" Service Protocol

We don't just "check the motor." We audit the entire life-safety envelope:

  • Volumetric Force Testing: We measure the air velocity at the exit door. When the door is opened, the fan must provide a "Blast" of air (minimum 1.0 m/s) to physically push back any encroaching smoke.

  • Force-to-Open Audit: We use a digital force gauge on the fire doors. If the ventilation system makes the door require more than 110 Newtons of force to open, the system is a safety hazard and needs VFD recalibration.

  • Corrosion & Seal Inspection: Fire fans are often on rooftops. We inspect for rust on the impeller and "perished" flexible connectors. A leaky connector means your "Life Safety Air" is blowing onto the roof instead of into the stairs.

  • VFD Fire-Mode Validation: We ensure the Variable Frequency Drive (VFD) is set to "Emergency Override," meaning it will ignore "Soft Faults" and run until the motor physically fails to keep the stairs clear.


3. The Energy & Mechanical Impact: The Cube Law

Fire escape fans are among the largest motors in your building. While they run rarely, their "Performance Test" runs can be a major source of peak-demand energy waste.

  • Friction Elimination: A fan with worn bearings or a slipping belt requires more "Hz" (speed) to hit that 50 Pa target.

  • The Logic: Because of the Cube Law, if we restore mechanical efficiency (alignment/lubrication), we can lower the fan speed by 20 percent while maintaining the same safety pressure, which reduces the power draw by nearly 50 percent.


4. Fire Escape Service Matrix


5. Why Trust EKG for Fire Escape Ventilation?

  • BOMBA Certification Support: We provide the "Form G" and technical witness logs required for your annual Fire Certificate (FC) renewal.

  • Mechanical Restoration Path: If your stairs aren't hitting 50 Pa, we are experts in Mechanical Fan Overhauls, offering on-site dynamic balancing and motor repairs.

  • VFD ROI Projection: we calculate the energy savings of "Tuning" your safety fans so they don't over-pressurize your building during monthly tests.

  • 2026 KL Standards: We stay updated on the latest Malaysia Fire Protection Association (MFPA) guidelines to ensure your building is future-proof.

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us