请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息
SSM
访客

26-Mar-2026

Office Ventilation Injection | 2026 Fleet Standards

In 2026, Office Ventilation Injection—the process of actively forcing filtered outdoor air into a building—is the primary mechanical requirement for legal occupancy in Malaysia. Under the DOSH ICOP IAQ 2026 and the EECA 2024, buildings are moving away from passive "fresh air dampers" toward active, sensor-driven Dedicated Outdoor Air Systems (DOAS).

At EKG M&E, we apply 34 years of mechanical engineering to bridge the gap between "Air Volume" and "Air Quality," ensuring your office meets the mandatory 10 l/s per person threshold while maintaining a 5-star Energy Intensity Label.


1. 2026 Compliance: The "10 l/s" Standard

The DOSH 2026 update has solidified the requirement for fresh air. To pass a federal health audit, your injection system must be calibrated to these physical parameters:

  • Mandatory Rate: At least 10 liters per second (l/s) per person.

  • The 1,000 ppm Barrier: Carbon Dioxide is the legal "Proxy" for ventilation. If your injection system cannot keep CO2 below 1,000 ppm, your building is non-compliant.

  • Standard IAQ Limits (2026):

    • Temperature: 23 – 26 °C

    • Relative Humidity: 40% – 70% (Crucial to prevent mold/fungal counts exceeding 1000 $cfu/m^3$)

    • Air Movement: 0.15 – 0.50 m/s


2. EECA 2024: The "Cube Law" Efficiency Strategy

Under the EECA 2024 (enforced Jan 2025), office buildings over 8,000 m^2 must display an Energy Intensity Label. Injecting hot Malaysian air is energy-expensive; we optimize this using the Affinity Laws (Cube Law).

  • VFD Modulation: We install Variable Frequency Drives (VFDs) on all fresh air injection fans.

  • The Cube Law Advantage: Fan power consumption is proportional to the cube of its speed.

  • The ROI: By using CO2 sensors to reduce your injection fan speed by just 20% during low-occupancy hours, you reduce its power consumption by nearly 50%. This single adjustment can shift a building from a 3-star to a 5-star BEI rating (le 90 kWh m^2 year).


3. Mechanical Health: TR19® Air Hygiene (March 2026)

Following the March 3, 2026, TR19® Air update, ventilation maintenance now requires strict verification for your "Injection" path:

  • Mandatory Post-Clean Reporting: You must now provide photographic evidence and Deposit Thickness Tests (DTT) to prove the injection ducts are clean.

  • Haze-Grade Filtration: To meet 2026 urban standards, injection units must use MERV-13 or higher filters to block PM2.5 and haze particulates.

  • Positive Pressure Shield: We balance the injection to be slightly higher than the exhaust. This creates Positive Pressure, which acts as an "Air Shield," pushing air out of cracks and doors to keep KL’s heat and humidity from leaking in.


4. 2026 Office Injection Technology Matrix

Feature Traditional System 2026 Injection (DOAS)
Control Fixed Speed (Always On) VFD / Demand-Controlled
Sensors Thermostat Only CO2 + Humidity + PM2.5
Filtration G4 / MERV 8 MERV 13 / 14 (Mandatory)
Documentation Paper Logs BMS Digital Audit Trail

Why Trust EKG M&E for Office Ventilation?

  • 34 Years of Engineering Depth: We understand the complex thermodynamics of "Latent vs. Sensible" cooling in the Malaysian tropics.

  • Audit-Ready Certification: We provide the IAQ Assessment Reports and Energy Performance Logs required for your 2026 Registered Energy Manager (REM).

  • Turnkey Integration: From installing Motorized Fresh Air Dampers to programming the final BMS logic, we handle the entire "Injection Path."

发信息至 EKG M & E SDN BHD
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us