请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
营业
时间
星期一 - 星期五 9:00 AM - 5:30 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
我们在 公共假期休息
营业 休息

EKG Project Update: Critical HVAC Restoration and Infrastructure Modernization

13-Feb-2026

EKG Project Update: Critical HVAC Restoration and Infrastructure Modernization

Kuala Lumpur | February 13, 2026EKG M&E Sdn Bhd continues to demonstrate its technical leadership in the MEP sector with the successful execution of multiple high-stakes HVAC restoration and installation projects. These images document our recent works involving advanced cryogenic pipe freezing, large-scale cooling coil replacement, and new unit deployment for our commercial and institutional clients.


PROJECT 1: HVAC SYSTEM RESTORATION & PIPE FREEZING

Scope of Work: Cooling Coil Replacement, Butterfly Valve Installation, and Cryogenic Pipe Freezing

1. Problem Statement

The existing HVAC infrastructure at this high-occupancy corporate site showed critical signs of mechanical and thermal failure:

  • Cooling Coil: Heavy fouling and significant fin degradation were identified, which severely reduced heat transfer and increased energy draw.

  • Seized Valves: Primary isolation valves were non-functional, preventing essential maintenance without a full system shutdown.

  • Operational Constraint: The client required a solution that ensured zero building-wide downtime during the repair process.

2. Technical Execution

To meet these demanding requirements, EKG implemented a specialized engineering protocol:

  • Cryogenic Pipe Freezing: Our technicians utilized liquid nitrogen to create a localized "ice plug" within the pressurized pipeline. This allowed us to isolate the work area and replace the seized valves without draining the entire building’s chilled water system.

  • Butterfly Valve Installation: Once isolated, the old components were replaced with high-performance lug-style butterfly valves for precise flow control and future-proof maintenance.

  • Cooling Coil Replacement: The degraded, fouled coil was systematically removed and replaced with a high-efficiency unit, restoring the system's original thermal rejection capacity.


PROJECT 2: COMMERCIAL AC INSTALLATION & LOGISTICS

Scope of Work: Unit Deployment, Structural Mounting, and Precision Integration

1. Problem Statement

As part of a facility expansion, new high-capacity cooling was required to ensure consistent comfort levels for a large-scale commercial site.

2. Technical Execution

  • Secure Logistics: EKG managed the safe transport and on-site positioning of multiple high-efficiency Daikin units. Our team ensures all equipment is handled according to manufacturer standards to protect warranty integrity.

  • Precision Installation: Technicians utilized scaffolding for high-level mounting of indoor units and outdoor condensers. All refrigerant lines were integrated using high-grade Armaflex insulation to prevent energy loss and condensation issues.

  • Commissioning: Each unit was rigorously tested for proper "Head" pressure and drainage flow to ensure reliable operation under high thermal loads.


3. Project Outcomes

  • 0% Operational Interruption: Our use of cryogenic pipe-freezing technology allowed the client to maintain full business operations throughout the maintenance period.

  • Increased Efficiency: The new cooling coils and AC units are estimated to deliver a 15-20% improvement in thermal performance.

  • Long-Term Reliability: By replacing seized valves and aged coils, we have significantly extended the operational life of the facility’s MEP infrastructure.


About EKG M&E Sdn Bhd

Based in Selangor, EKG M&E Sdn Bhd is a premier MEP specialist providing integrated solutions for the most complex mechanical and electrical challenges. From cryogenic pipe repairs to large-scale infrastructure deployment, we remain the trusted partner for Malaysia’s leading corporate and institutional sectors.

Is your facility facing HVAC inefficiency or urgent mechanical failures? Contact us today for a professional site audit and a custom-engineered maintenance proposal.

总办事处

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur’s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.eakon.com.my
网址: https://eakon.newpages.com.my/
网址: https://eakon.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us