请登录后使用此功能。 您可以使用此功能将商品添加到您的收藏列表。
关闭
您已经添加该商品到您的收藏列表。 查看我的收藏
关闭
从您收藏列表中删除此商品。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的收藏夹列表。
关闭
这家公司已成功添加。 查看我的收藏
关闭
这家公司已从你的收藏夹列表中删除。
关闭
请登录后使用此功能。 您可以使用此功能将公司添加到您的询问车。
关闭
这家公司已被添加到您的询问车。
关闭
这家公司已从询价车中删除。
关闭
该商品已被添加到您的询问车。
关闭
该商品已经从您的询价车中删除。
关闭
商品/公司已达到添加至询价车的数量。
关闭
Etepox Solution Sdn Bhd
Etepox Solution Sdn Bhd 201101019530 (947663-V)
营业
时间
星期一 - 星期五 9:00 AM - 6:00 PM
星期六 9:00 AM - 1:00 PM
星期日 休息
营业 休息
SSM
60122388020
erictoh855 WeChat QR
WeChat QR

Wechat ID: erictoh855

Guide to Applying the Sandwich System Running Track (Including Drainage System)

20-Aug-2025

The Sandwich System Running Track is one of the most popular athletic surface solutions worldwide due to its performance, durability, and suitability for professional competitions. Unlike the simpler Spray Coat System, the Sandwich System incorporates an additional elastic layer to provide better shock absorption, higher force reduction, and consistent performance.
This article provides a detailed step-by-step guide to applying the Sandwich System—from base preparation to the final top coat—while also addressing the importance of drainage systems to ensure long-term performance.

1. Base Construction and Drainage System
Before installing the running track surface, proper sub-base preparation and drainage are critical. A poorly constructed base will compromise the entire system.
1.1 Sub-Base Requirements
  • Material: Well-compacted asphalt or concrete base.
  • Surface Regularity: Level with a slope of 0.5–1% to allow water runoff.
  • Strength: Adequate compressive strength to support loads without deformation.
1.2 Drainage System
  • Perimeter Drainage: Open concrete or polymer channels around the track perimeter to collect surface water.
  • Internal Drainage: Slot or pipe drains may be included under the track base for areas with high rainfall or poor soil percolation.
  • Slope Design: The running track should slope gently (0.5–1%) toward drains to prevent water ponding.
  • Connection to Main Drainage: All collected water should flow into municipal or stadium drainage systems.
Tip: Without an effective drainage system, water infiltration can damage both the elastic layers and top coatings, leading to premature surface failure.

2. Sandwich System Installation Process
The Sandwich System consists of multiple specialized layers applied in sequence:
Step 1: Base Primer Application
  • Purpose: Promotes strong adhesion between asphalt/concrete base and polyurethane layers.
  • Application: Roll or spray apply polyurethane-based primer.
  • Curing: Allow primer to dry before proceeding.
Step 2: Elastic Base Layer
  • Material: Recycled black SBR (Styrene Butadiene Rubber) granules bound with polyurethane binder.
  • Application: Laid using a paving machine or hand trowel to form a shock-absorbing base.
  • Thickness: Typically 10–15 mm depending on system design.
  • Function: Provides cushioning, force reduction, and base elasticity.
Step 3: Sealing Layer
  • Material: Polyurethane seal coat mixed with fine rubber powder.
  • Purpose: Seals pores in the SBR base to prevent water penetration and ensures smoothness.
  • Result: Creates a uniform, non-porous surface for the next layer.
Step 4: PU Self-Leveling Layer
  • Material: Two-component polyurethane applied by squeegee.
  • Thickness: Around 2 mm.
  • Function: Smooth, seamless elastic layer that forms the "sandwich" between SBR base and EPDM top coat.
Step 5: EPDM Wearing Layer (Top Coat)
  • Material: Colored EPDM (Ethylene Propylene Diene Monomer) granules broadcast into freshly applied polyurethane adhesive.
  • Thickness: 3–4 mm.
  • Application: EPDM granules are spread evenly across the surface, then excess granules removed after curing.
  • Result: UV-resistant, anti-slip, weatherproof surface with long-term durability.
  • Color Options: Traditionally red or blue, but available in multiple colors for lane markings.
Step 6: Line Marking
  • Material: Polyurethane or specialized track marking paint.
  • Application: Applied using stencils for accuracy, ensuring compliance with IAAF/World Athletics standards.

3. Key Benefits of the Sandwich System
  • Superior force reduction and shock absorption.
  • Enhanced comfort and injury prevention for athletes.
  • Weather resistance with effective drainage integration.
  • Long service life with proper maintenance.
  • Compliance with international competition standards.

4. Maintenance Considerations
  • Regular sweeping and washing to remove dirt and debris.
  • Inspection of drainage channels to prevent blockages.
  • Prompt repair of any surface damage.
  • Reapplication of line markings when faded.

Conclusion:
The Sandwich System Running Track offers a premium, competition-grade surface with excellent durability and performance. Successful installation depends not only on the correct application of each material layer but also on the integration of an efficient drainage system. With proper base preparation, systematic installation, and ongoing maintenance, a Sandwich System track can deliver world-class athletic performance for decades.

 
总办事处

Etepox Solution Sdn Bhd 201101019530 (947663-V)
27-6 & 27-7, Menara Mutiara Central, No. 2, Jalan Desa Aman 1, Cheras Business Centre, 56100 Cheras, Wilayah Persekutuan Kuala Lumpur, Malaysia.

电话:

邮件:
网址: https://www.etepox.com
网址: https://etepox.newpages.com.my/
网址: https://etepox.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • US 8173
  • BR 1956
  • AU 1398
  • CA 1350
  • TH 1275
  • JP 1226
  • SG 1135
  • MY 947
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us