Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
Weblast Sdn Bhd
Weblast Sdn Bhd 199301015443 (270183-M)

15-Apr-2026

FBE & 3LPP Coating System

Tags:
-
Produk Dilihat 9

Work Size up to 9mL x 2mH x 1.5mW x 6 Tons Weight

Bends and fittings coating line includes the process of material handling through blasting chamber, oven chamber and powder spray booth. Anti-corrosion coating applicable here is Fusion Bonded Epoxy (FBE) and 3 Layer Polyethylene/Polypropylene (3LPP).

Shown below is the system specially designed & constructed on turnkey basis for PetroVietnam (PVID)

Monorail Hanger at Loading Bay, Loading Long Radius Pipe Bend, Going Through Blast Room & Heating Oven

 

In current practice, there are three common anti-corrosion coating methods, including Asphalt Enamel (AE) coating, FBE and 3LPE/PP method combined with FBE. AE method has not been used in developed countries for AE is dependent on oil price since the coating material is a petroleum products. Beside having adverse impact on the environment, AE has higher cost of implementation and maintenance while life span of AE pipes is shorter than those in other advanced coating methods.

Spray Booth is immediately after the heating oven & the result is the 3 Layer Polyethylene/Polypropylene finish

 

Weblast has been consulted for the turnkey construction of this coating plant, begining in July 2011 and completely installed & commssioned in Nov 2011. Among other equipment installed are,

  • The ground handling trolley for the blast cleaning process
  • A fully equiped full floor recovery blast room installed with 2 blast guns and dust collector unit
  • A gas fired recirculation oven capable of heating up to 250 Deg C with even temperature control
  • The main burner system is from Maxon with uniform air distribution duct works and gas piping
  • Two units of Gema twin guns powder spray equipment are used for the spray booth
  • Other equipment are the Ingersoll Rand compressed air system, powder recirculation cyclon collector & dust collector with safe explosion vent setup.

Hantar mesej anda ke Weblast Sdn Bhd
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

Weblast Sdn Bhd 199301015443 (270183-M)
PT 4948, Jalan TS 2/1 A, Taman Semarak 2, 71800 Nilai, Negeri Sembilan, Malaysia.

Tel:

Emel:
Laman Web: https://www.weblast.com.my
Laman Web: https://weblast.newpages.com.my/
Laman Web: https://weblast.onesync.my/

Pejabat Lain

Factory
Lot 72, Jalan Permata 1/2, Arab Malaysia Industrial Park, 71800, Nilai, Negeri Sembilan, Malaysia.

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us