- PAPAN TANDA BAHAYA-BAYA LAIN BERDEKATAN
- CURVE TO THE RIGHT SIGNAGE
- CURVE TO THE LEFT SIGNAGE
- ROAD NARROWS ON THE LEFT SIGNAGE
- ROAD NARROWS ON THE RIGHT SIGNAGE
- CHEVRON (LEFT) SIGNAGE
- CHEVRON (RIGHT) SIGNAGE
- ROAD DIVERGES SIGNBOARD
- CONSTRUCTION WORKS AHEAD IN 200M SIGNBOARD
- CAUTION, REDUCE SPEED SIGNBOARD | AWAS, KURANGKAN LAJU
- CAUTION, FLOOD AREA SIGNBOARD
- TEMPORARY SPEED LIMIT SIGN | 50KM/J SPEED LIMIT SIGNAGE
- FLAGMAN AHEAD IN 200M SIGNBOARD
- PASS ONTO THE LEFT SIGNBOARD
- PASS ONTO THE RIGHT SIGNBOARD
- DETOUR, FOLLOW ARROW SIGNBOARD
- DETOUR TO THE LEFT SIGNAGE
- DETOUR TO THE RIGHT SIGNAGE
- END OF CONSTRUCTION SIGNAGE | PAPAN TANDA PEMBINAAN TAMAT



BR 24843
VN 8704
US 7360
IN 4331
AR 4033
MX 3755
BD 2390
ID 2167
