Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
PENGUNJUNG

16-May-2026

VAV Terminal Retrofitting for AHU Systems: VAV Box Upgrades

Under the full enforcement of Malaysia’s Energy Efficiency and Conservation Act (EECA) 2024, commercial real estate assets and multi-facility industrial operations must aggressively optimize their Building Energy Intensity (BEI). Running unmodulated legacy systems directly drives up Scope 2 indirect emissions. Properties failing to meet mandatory efficiency thresholds face severe statutory non-compliance penalties.

Transitioning from Constant Air Volume (CAV) layouts or upgrading degraded, legacy Variable Air Volume (VAV) terminal boxes represents a critical engineering step to achieve advanced, data-verified air-side efficiency. By deploying smart, pressure-independent terminal vessels, building operators can transform a rigid air distribution network into an open-protocol, demand-responsive network that actively lowers carbon footprints and complies with statutory limits.


1. Key Engineering Elements of VAV Box Upgrades

  • Pressure-Independent Volumetric Modulation: Legacy constant-volume systems dump a flat stream of cold air into a floor plate regardless of changing internal heat loads, leading to continuous over-cooling. Early automated attempts used pressure-dependent dampers, which fluctuate wildly whenever adjacent zone dampers close, disrupting downstream airflow stability. Modern pressure-independent VAV boxes completely isolate zone airflow from upstream duct pressure dynamics by nesting a volumetric flow control loop inside the primary temperature control loop. The local controller constantly measures actual volumetric velocity through the box. If header duct pressure spikes due to changes elsewhere on the floor, the terminal box automatically adjusts its internal damper to maintain the exact airflow volume required by its zone.

  • Multipoint Pitot Tube Averaging Flow Sensor Grids: Single-point velocity sensors or hot-wire anemometers installed in branch ductwork frequently deliver inaccurate readings because air flowing through a duct does not move uniformly. Air friction along the duct walls creates severe velocity stratification, turbulences, and eddies, which lead to erratic control responses and sensor hunting in legacy setups. We integrate aerodynamic, multipoint pitot tube averaging flow sensor grids directly into the primary inlet collar of each retrofitted VAV terminal box container. The sensor dynamically calculates the average difference between total pressure and static pressure across the entire cross-section of the duct inlet. This provides a clean, highly accurate velocity pressure signal back to the local controller.

  • Establishing a Request-Based Static Pressure Reset Optimization Loop: Throttling downstream VAV boxes causes a major restriction in the air pathways, driving up static pressure inside the supply duct network. If the central fan continues to run at a fixed speed against this resistance, the system wastes considerable energy, counteracting your zone-level savings. High-accuracy digital pressure transducers are deployed downstream in the index run of the primary supply ductwork, tracking real-time system resistance. The centralized BMS executes an automated, request-based static pressure reset script. The script polls all downstream VAV box damper position percentages over the integrated network. If the zone dampers are mostly closed, indicating satisfied space temperatures, the automation loops float the main duct static pressure target downward. The reset loop continues until the single most demanding zone damper is open near its maximum threshold. The central air handler array backs down its rotational velocity to match this lower resistance, compounding air-side energy savings.

  • Synchronization with Direct-Drive IE5 EC FanWall Arrays: The core carbon and BEI abatement of request-based pressure resets is unlocked by upgrading the central air-moving hardware from inefficient, legacy configurations to premium motor technologies. We remove legacy belt-driven centrifugal fans and single, oversized induction motors from the primary AHU Box. In their place, we install a parallel matrix of multiple, smaller direct-drive plug fans powered by permanent-magnet IE5 Electronically Commutated (EC) Motors. These motors maintain exceptionally high efficiency profiles even under deep speed modulation. When the integrated network signals a drop in system resistance due to synchronized zone throttling, the central speed controls dial down the fan velocity. This leverages the fluid dynamics of the Fan Affinity Laws, which dictate that dropping a fan's operating speed reduces motor active power consumption at a cubic rate, directly improving the audited BEI score.


2. Mitigating Mechanical Liabilities Within the Upgrade Scope

Advanced digital control networks and speed modulation scripts will provide inaccurate data and fail operationally if the physical container housing the air streams suffers from structural neglect. Our structural installation and testing and commissioning (T and C) procedures eliminate these physical faults.

  • Securing Casing and Duct Integrity (ATC 6 Class L1): When variable-speed EC fans adjust speed and downstream digital VAV dampers modulate during optimization cycles, internal static pressure profiles shift throughout the system. A poorly sealed AHU Frame or leaky duct collars will draw unconditioned, humid plant room air directly into the negative-pressure side of the casing. This air bypass forces the cooling coil to handle unmanaged latent moisture, increasing chiller energy draw and throwing off network-tuned optimization loops. We structurally reinforce and seal all panel connections and duct collars to guarantee an airtight pressure containment vessel.

  • Neutralizing The Sponge Effect: Slowing fan speeds to match lower VAV volume targets alters the face velocity profile across internal cooling coils. If condensed water droplets carry over off the coil fins and hit legacy internal fiberglass insulation, the material traps water like a sponge. This damp layer—known as the Sponge Effect—acts as a hidden microbial breeding ground that releases mold spores into the ductwork, fouling downstream digital velocity sensors and reducing air pathways. We strip out old fiberglass and install Fiber-Free Closed-Cell Insulation, establishing a smooth, hydrophobic internal skin.

  • The Hardwired BOMBA Override: Under BOMBA (JBPM) 2026 lifecycle codes, automated network control maps and energy-saving speed logic must never compromise life safety. Every retrofitted smart VAV box and central air handling asset features a hardwired safety interlock connected directly to the local Fire Alarm Monitoring System (FAMS). Upon receiving an emergency trigger from the fire panel, all digital optimization loops are instantly bypassed to execute immediate emergency shutdown or full smoke-spill ventilation protocols.


3. Statutory and Financial Drivers in Malaysia

  • Green Investment Tax Allowance (GITA) Capital Tax Eligibility: Retrofitting an existing commercial tower or industrial plant with smart pressure-independent VAV terminal boxes, integrated digital DDC networks, and premium IE5 EC fan arrays is an officially recognized energy-efficiency intervention in Malaysia. The complete cost of hardware, installation labor, and engineering integration qualifies for the Green Investment Tax Allowance (GITA), allowing capital expenditures to be offset directly against corporate tax liabilities.

  • Fines Avoidance: Lowering your building's annual energy consumption and proving a verifiable, cloud-logged data trail via your upgraded digital system shields building owners from statutory penalties for non-compliance with the mandatory building energy intensity benchmarks enforced by the EECA 2024.

  • Star Label Optimization: Lowering your building's total annual energy consumption directly reduces your BEI score, allowing your asset to secure a prestigious Building Energy Label from the Energy Commission (ST) or high-tier GBI/LEED certifications. This satisfies institutional procurement mandates and attracts high-value multinational corporation (MNC) tenants.

Are your facility's zone terminals currently operating on legacy constant-volume configurations or pressure-dependent dampers that cause control hunting and inflate your utility bills, or are you ready to transition to an optimized 2026 Pressure-Independent VAV Box platform?

Hantar mesej anda ke EKG M & E SDN BHD
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.eakon.com.my
Laman Web: https://eakon.newpages.com.my/
Laman Web: https://eakon.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us