Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
EKG M & E SDN BHD
EKG M & E SDN BHD 201201033712 (1018200-D)
Waktu
Pejabat
Isnin - Jumaat 9:00 AM - 5:30 PM
Sabtu 9:00 AM - 1:00 PM
Ahad Closed
We′re closed on Public Holiday
Open Closed
Onesync AI SSM
PENGUNJUNG

12-May-2026

AHU Installation Testing: Performance Verification & Compliance

In the 2026 engineering landscape of Malaysia, AHU Installation Testing has transitioned from a routine contractor checklist to a high-stakes statutory verification. Under the Energy Efficiency and Conservation Act (EECA) 2024, which became fully enforceable on January 1, 2025, every new or retrofitted Air Handling Unit must undergo rigorous testing to prove it meets the mandatory Energy Intensity Label benchmarks and MS 1525:2024 standards.

At EKG (Malaysia) SDN BHD, our testing protocols ensure that your installation is not only mechanically sound but also "Audit-Ready" for the Energy Commission (ST) and DOSH (JKKP).


1. Static Integrity & Leakage Testing (Pre-Commissioning)

Before the fans are energized, the physical integrity of the casing and joints must be verified to prevent "Energy Theft."

  • Class L1 Leakage Test: Following EN 1886 or SMACNA standards, we pressurize the casing to verify that leakage rates remain within the legal limit. Any leak at 2026 standards is a thermal liability that spikes your Specific Fan Power (SFP).

  • Thermal Bridge Verification: Utilizing infrared thermography, we check the TB2 Thermal Break gaskets for "cold spots." This prevents exterior sweating, which is a primary cause of structural corrosion and a violation of JKKP hygiene mandates.

  • Plinth & Leveling Check: We verify the mandatory 1:100 slope toward the drain pan. Leveling is critical; stagnant water in the pan will fail a 2026 statutory health audit due to microbial risks.


2. Performance Verification (Dynamic Testing)

Dynamic testing proves that the "As-Installed" unit delivers the efficiency promised in the LOD 400 BIM design.

Test Category 2026 Statutory Benchmark Engineering Outcome
Airflow Balancing +/- 5% of design CFM Ensures "First-Time-Right" comfort and avoids over-ventilation waste.
SFP Verification < 1.1 kW/m3/s Legal proof of efficiency required for the building’s energy license.
Acoustic Mapping NC 30-35 (Silent Standard) Confirms that mounting and attenuators are decoupling vibration correctly.
Power Consumption Within 5% of nameplate Verification for the mandatory Energy Management System (EnMS).

3. Statutory & Digital Compliance Testing

As of January 1, 2026, "Performance Testing" must be documented digitally to satisfy the July 2025 BIM Mandate.

  • Sensor Calibration: We perform a full 3-point calibration on all CO2, VOC, and static pressure sensors. Inaccurate sensors are the #1 cause of EECA 2024 non-compliance, as they lead to incorrect Demand Control Ventilation (DCV) logic.

  • Digital Twin Handover (LOD 500): All test results—including fan curves and air pressure profiles—are uploaded to the unit’s Digital Birth Certificate. This provides the baseline data for your mandatory 5-year periodic energy audit.

  • Interlock Testing: We verify the hard-wired interlocks between the AHU, the fire alarm system, and smoke-spill dampers to ensure BOMBA compliance.


4. Why Partner with EKG (Malaysia) SDN BHD?

  • Technical Integrity: Our testing is led by mechanical engineers who specialize in the thermodynamics of tropical air treatment.

  • Zero-Gap Remediation: If a unit fails a performance benchmark, we don't just report it; we use our Zero-Subcontractor model to immediately remediate the seals, balancing, or VSD programming on-site.

  • GITA Proofing: Our certified test reports provide the auditable evidence required for your business to claim the 100% Green Investment Tax Allowance.

Is your AHU installation testing a simple "Pass/Fail" or a 2026-compliant asset verification? Contact EKG (Malaysia) SDN BHD today for specialized AHU Installation Testing.

Are you preparing for a new building handover, or is this a performance audit for an existing high-rise facility?

Hantar mesej anda ke EKG M & E SDN BHD
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

EKG M & E SDN BHD 201201033712 (1018200-D)
27-2 & 27-3, Jalan Kuchai Maju, Kuchai Entrepreneur¡¯s Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur, Malaysia.

Tel:

Emel:
Laman Web: https://www.eakon.com.my
Laman Web: https://eakon.newpages.com.my/
Laman Web: https://eakon.onesync.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

Seni Jaya Logo
Brochure
Download
Our PackageContact Us